Published June 7, 2023 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a municipal facility in Columbus, Minnesota. Completed plans call for the construction of a 26,000-square-foot municipal facility.

Provide labor, material, and equipment necessary to properly execute the work of this Work Scope in accordance with Contract Documents and specifically the specifications sections listed herein. 1. Contract Documents are complementary, and what is required by one shall be as binding as if required by all. 2. Each contractor is responsible for the general, structural, architectural, mechanical and electrical notes as they relate to their Work Scope. 3. It is the intent of this Work Scope and responsibility for this contractor to provide a complete operational assembly/system, unless specifically indicated below. 4. Review the entire project so that proceeding, concurrent and succeeding work of other contractors can proceed without harm to the Project as a whole. 5. Each contractor is required to coordinate their work with other contractors, as directed by Kraus-Anderson, without additional compensation. 6. By submitting your Proposal/Bid, each contractor acknowledges they have review all appropriate contract documents, including previously issued documents and have anticipated, based on information provided or available, impact of future Work as it affects their Work Scope. Cut off Date for Questions: May 22th @ 2:00 New Construction (site work, foundations, structural system erection, building shell, interiors, mechanical and electrical). PLEASE BE SURE TO COMPLETE THE REQUIRED FEDERAL SPECIAL PROVISIONS FORM WHEN SUBMITTING YOUR SEALED BID. THIS FORM IS ATTACHED TO THE BID FORMS. THANK YOU *Addendum No. 1 and 2 have been issued. Please make sure you acknowledge this on your bid form. *BID DAY - IN PERSON SEALED BIDS Just a reminder/clarification in regards to submitting SEALED bids on bid day - Wednesday, May 31, 2023. All SEALED bids will be received in-person at the Washington County Government Center Office of Administration 5th Floor, 14949 62nd Street North, Stillwater, MN 55082 then publicly opened and read aloud. Bids will be received until 2:00 p.m. local time on May 31, 2023. Bid-Results:- 1. WS 32-F Irrigation and Landscaping- Hoffman & McNamara Co.- $223,310 2. WS 32-D.1 Site Fence- Century Fence Company - $115,900 3. WS 21-A Fire Suppression- Nasseff Mechanical Contractors, Inc. - $96,400 4. WS 09-K Painting & Wall Covering- Mulcahy Nickolaus, LLC- $85,437 5. WS 32-B Concrete Paving-North Country Concrete, Inc- $427,000 6. WS 31-A Site Clearing, Earthwork, Site Utilities-Kevitt Excavating,LLC-$2,573,000 7. WS 11-B Loading Dock Equipment-DOORCO, Inc.- $46,580 8. WS 09-D Flooring- St. Paul Linoleum & Carpet Company- $29,615 9. WS 26-A Electrical-A. J. Moore Electric, Inc.- $729,400 10. WS 23-B Combined Mechanical-Ryan Mechanical,Inc.-$1,647,000 11. WS 08-D Specialty Door-DOORCO, Inc.-$146,004 12. WS 08-F Entrances/Storefront/Curtain Wall-Minneapolis Glass Company-$136,981 13. WS 09-C Ceiling & Acoustical Ceilings-Sonus Interiors, Inc-$31,000 14. WS 09-B Tile- Commercial Flooring Services, LLC - $69,087 15. WS 07-F Metal Panels-Nordstrom Architectural Sheet Metal-$279,800. 16. WS 08-A Doors, Frames, & Hardware - Material Only- Twin City Hardware Company- $109,000 17. WS 07-A Waterproofing-Henkemeyer Coatings, Inc.- $55,346 18. WS 05-B Structural Steel Erection- Top Line Steel Corporation- $133,600 19. WS 07-H Roofing-BL Dalsin Roofing-$581,048 20. WS 03-A Concrete & Masonry- Axel H. Ohman, Inc.-$950,000 21. WS 06-A Carpentry- Kellington Construction, Inc- $219,975 22. WS 01-J Final Cleaning- Midwest Specialty Maintenance, Inc- $19,694 23. WS 05-D Miscellaneous Metals- Top Line Steel Corporation- $15,100

Bid Results

Municipal

$8,520,277.00

Public - County

New Construction, Site Work

123

31

38

26

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer?s Field Services, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Water, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition, Building Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies, Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Gratings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Gypsum Sheathing, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Sheet Waterproofing, Fluid-Applied Waterproofing, Thermal Protection, Thermal Insulation, Vapor Retarders, Roofing and Siding Panels, Metal Wall Panels, Membrane Roofing, Elastomeric Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Flush Wood Doors, Specialty Doors and Frames, Access Doors and Panels, Access Doors and Frames, Panel Doors, Entrances and Storefronts, Aluminum-Framed Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Glazed Aluminum Curtain Walls, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Louvers, Door Louvers, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Base and Accessories, Resilient Sheet Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Wall and Door Protection, Corner Guards, Toilet, Bath, and Laundry Accessories, Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Flagpoles
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment, Commercial Equipment, Mercantile and Service Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Window Shades, Roller Window Shades, Casework, Countertops, Furnishings and Accessories, Furniture, Seating, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Piping Specialties, Domestic Water Pumps, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Facility Storm Drainage, Facility Storm Drainage Piping, Storm Drainage Piping Specialties, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, Facility Fuel Systems, Facility Fuel Piping, Facility Natural-Gas Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Fuel-Fired Heaters, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Transfer Switches, Automatic Transfer Switches, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Soil Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Seal Coats, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Retaining Walls, Planting, Planting Preparation, Landscape Grading, Turf and Grasses, Seeding, Plants, Shrubs, Trees, Planting Accessories, Planters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Lifts, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
75
Bidding Soon
866
All Active Projects
444
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2023

September 8, 2023

img_map_placeholder

20001 FOREST LAKE BLVD N,, Columbus, MN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Washington County Northern Environmental Center - BP 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.