BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Waukee, Iowa. Completed plans call for site work for a water / sewer project.

Construct Transite Water Main Replacement - Phase 3 including all labor, materials, and equipment necessary for approximately 3,530 linear feet of 8-inch water main primarily directional bored in place, hydrants, valves, fittings, connections to the existing system, service reconnections, surface restoration and miscellaneous associated work, including cleanup. The Transite Water Main Replacement - Phase 3 will be located along segments of Northview Drive, Kaylin Drive and Denlee Drive. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied by bid security, as follows: a certified or cashier's check, drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to ten percent (10%) of the bid, or a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa in a penal sum of ten percent (10%) of the bid. The successful bidder will be required to furnish bonds in an amount equal to one hundred percent (100%) of the contract price, said bonds to be issued by responsible surety approved by the City Council and listed in the U.S. Treasury Department's most current list (Circular 570, as amended) and authorized to transact business in the State of Iowa and shall guarantee (1) the faithful performance of the contract and the terms and conditions therein contained, (2) the prompt payment to all persons, firms, subcontractors and corporations furnishing materials for or performing labor in the prosecution of the work, and (3) the maintenance of improvements in good repair for not less than four (4) years from the time of acceptance of the improvements by the City. The work will commence within ten (10) calendar days after the date set forth in written Notice to Proceed and shall be completed by May 31, 2024. The duration of the work is critical to the project so as to minimize the disruption associated with the project to the public. Damages in the amount of Five Hundred Dollars ($500.00) per calendar day The City Council reserves the right to reject any or all bids, to waive informalities or technicalities in any bid and to accept the bid which it deems to be to the best interest of the City. Questions regarding meeting format may also be directed to the City Clerkis office at 515-978-7904.

Award

Water / Sewer

$703,688.00

Public - City

Site Work

15

3

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
38
Bidding Soon
444
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2023

June 22, 2023

img_map_placeholder

Northview Dr, Waukee, IA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.