BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a water / sewer project in Denver, Colorado. Completed plans call civil work for a water / sewer project.

DEADLINE TO SUBMIT QUESTIONS: MAY 18, 2023 by 1:00 p.m - Must send to DOTI.Procurement@denvergov.org. The Engineers Estimate for total bid amount (Supplemental Labor, Subcontracted Work, Allowance Accounts, and $9,100.00 Textura Fee) is $4,280,000.00 (contract amount is not guarantee of work). The contractor shall follow City specifications and standard details. The work includes any construction repairs on wastewater facilities (ponds, outfall, etc.), water quality facilities (ponds, outfalls, trash racks, etc.), and sewer (storm and sanitary conduits) components including, but not limited to: o Excavations o Plumbing o Trucking o Paving o Landscaping o Reinforced concrete structures, etc. o Lift station and pump station repair is also needed Participation - 9% MWBE Fictitious Scenario 1- Emergency Sanitary Sewer Repair: Overnight, a 6" deep sink hole has formed in a heavy traffic arterial roadway in Denver, CO due to the failure of an 8" sanitary line that is 15-deep. The area needs to be stabilized immediately and repaired within 12 hours. After further investigation, it is apparent that 100 LF of the 8" sanitary sewer line needs to be replaced, and the sanitary sewer line is leaking into the storm sewer and ultimately into a Waters of the US (South Platte River). The soils are in an area that is within a CCD delineated historic landfill area and so the soil could have asbestos containing materials and/or heavy metals. It is expected that the Contractor will work directly with the Denver Department of Health & Environment (DDPHE) to manage the sewage clean up and coordinate disposal of any excavated materials to Denver Arapahoe Disposal Site (DADS). The contractor shall respond within 1 hour of the City notifying the Contractor or Contractor's 24/7 hotline and shall mobilize within 12 hours to stabilize the site and perform the repair within a week after the CCD PM has agreed to the specific scope of work. Subcontractors and rentals can be utilized to supplement the Prime Contractor. Fictitious Scenario 2- Lift Station Failure: A sanitary lift station has failed. A major rain event is happening, a short circuit/electrical explosion that takes out the Motor Control Center. After some time, the large rain event floods the lift station and sewage is leaking from the lift station into a Waters of the US (South Platte River). The soils are in an area that is within a CCD delineated historic landfill area and so the soil could have asbestos containing materials, heavy metals or radium. The contractor is expected to provide a generator pump onsite to bypass the sanitary inflow from a large 60" gravity main. It is expected that the Contractor will work directly with the Denver Department of Health & Environment (DDPHE) to manage the sewage clean up and coordinate disposal of any excavated materials to Denver Arapahoe Disposal Site (DADS)

Post-Bid

Water / Sewer

$4,280,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
38
Bidding Soon
998
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2023

August 7, 2023

img_map_placeholder

Multiple Locations, Denver, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.