BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 14, 2023 at 8:00 PM

Updated February 13, 2024

Site work, paving and outdoor lighting for a mixed-use development in Mesa, Arizona. Completed plans call for site work for a transportation facility; for paving for a transportation facility; water / sewer project; and for outdoor lighting for a transportation facility.

The Runway 12R-30L Reconstruction (Schedules I-III) and Taxiway H Demolition and Taxiway B2 Construction (Schedule IV) projects may be funded by grants from the Federal Aviation Administration (FAA), Arizona Department of Transportation (ADOT-MPD Aeronautics Group) and the Owner. The Sponsor of this project is the Phoenix Mesa Gateway Airport Authority.The Runway 12R-30L Reconstruction project (Schedules I-III) includes the reconstruction of the 7,255-foot portion of Runway 12R-30L between the previously reconstructed thresholds. In addition to the need of new runway concrete pavement, the intent of this project is to also fix the nonstandard transverse and longitudinal grades within the runway pavement and non-standard grades within the Runway Safety Area (RSA). This project will also include the following items The Taxiway H Demolition and Taxiway B2 Construction (Schedules IV) project includes the demolition of Taxiway H and construction of new Taxiway B2 located between Runway 12R-30L and Taxiway B. This work includes installing new taxiway signs, taxiway edge lights, and drainage infrastructure BID SECURITY: Every bid must be accompanied by a certified check, cashier's check or surety bond for ten percent (10%) of the amount of the bid

Bid Results

Transportation Terminals

$8,811,654.00

Public - City

Outdoor Lighting, Paving, Site Work

186

18

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
32
Bidding Soon
1,496
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.