Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 14, 2023 at 8:00 PM
Updated February 13, 2024
Site work, paving and outdoor lighting for a mixed-use development in Mesa, Arizona. Completed plans call for site work for a transportation facility; for paving for a transportation facility; water / sewer project; and for outdoor lighting for a transportation facility.
The Runway 12R-30L Reconstruction (Schedules I-III) and Taxiway H Demolition and Taxiway B2 Construction (Schedule IV) projects may be funded by grants from the Federal Aviation Administration (FAA), Arizona Department of Transportation (ADOT-MPD Aeronautics Group) and the Owner. The Sponsor of this project is the Phoenix Mesa Gateway Airport Authority.The Runway 12R-30L Reconstruction project (Schedules I-III) includes the reconstruction of the 7,255-foot portion of Runway 12R-30L between the previously reconstructed thresholds. In addition to the need of new runway concrete pavement, the intent of this project is to also fix the nonstandard transverse and longitudinal grades within the runway pavement and non-standard grades within the Runway Safety Area (RSA). This project will also include the following items The Taxiway H Demolition and Taxiway B2 Construction (Schedules IV) project includes the demolition of Taxiway H and construction of new Taxiway B2 located between Runway 12R-30L and Taxiway B. This work includes installing new taxiway signs, taxiway edge lights, and drainage infrastructure BID SECURITY: Every bid must be accompanied by a certified check, cashier's check or surety bond for ten percent (10%) of the amount of the bid
Bid Results
Transportation Terminals
$8,811,654.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2023
July 3, 2023
6033 S Sossaman Rd, Mesa, AZ
Related To This Project
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
Bid Date: Jun 01 2023
Mesa, AZ
Bid Date: May 25 2023
Mesa, AZ
Bid Date: May 30 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
