BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lincoln, Nebraska. Completed plans call for site work for a water / sewer project.

**As of May 22, 2023, project was awarded to Construction Inc., and the awarded amount is $375,688.32** These Special Provisions amend or supplement the City of Lincoln Standard Specifications for Municipal Construction, 2023 Edition, and other provisions of the Contract Documents as indicated herein. All provisions that are not so amended or supplemented via these special provisions remain in full force and effect. Due to damage of the existing water main system in this area under the Salt Creek along 70 th Street, the watermain has been shut down both north and south of the existing leak in this area. The water main replacement shall begin with a water valve replacement at Station 7+45 north ofthe proposed tie in for the High-Density Polyethylene (HDPE) Pipe. The contractor shall remove existing 16" watermain from Sta 2+70 to Sta 2+85 and Sta 6+40 to Sta 7+15 and construct the HDPE pipe from Sta 2+85 to Sta 7+00. The Contractor shall construct solid sleeves at Sta 2+71 and Sta 7+15 to connect new 16" watermain and the existing 16" watermain in this area. Flushing and sampling locations to be coordinated with Lincoln Water Systems. Lincoln Water System: There are mains and services within project limits; Work shall be completed as shown on the plans. The Contractor will be required to coordinate with Lincoln Water System as needed. Contact: Dave Beyersdorf Phone: 402.441.5932 Lincoln Wastewater System: There are mains and services within project limits; they should not be in conflict and no relocations are anticipated. Contact: Mike Mandery Phone: 402.416.8244 Lincoln Watershed Management: Watershed Management has existing storm drainage facilities within the limits of the project. No conflicts or relocations are anticipated. Contact: Tim Byrne Phone: 402.416.5342 2) Contact our office at 402-441-8103 to assistance over the phone.

Award

Water / Sewer

$375,688.00

Public - City

Site Work

8

5

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
54
Bidding Soon
811
All Active Projects
334
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 10, 2023

July 10, 2023

September 1, 2023

img_map_placeholder

Multiple Locations, Lincoln, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.