Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 12, 2023 at 8:00 PM
Updated May 23, 2024
Site work for a water / sewer project in Salem, New Hampshire. Completed plans call for site work for a water / sewer project.
Work includes, but is not limited to, the transfer of approximately 43 water services from the existing 6-inch cast iron water main to existing 16-inch ductile iron water main on North Main Street, Salem, NH between the Bluff Street and Main Street intersections. Work shall also include abandonment of existing 6-inch water main, removal of an existing hydrant, temporary paving, permanent trench paving, and surface restoration, where required. Work also includes installation of approximately 30 linear feet of 16-inch zinc coated ductile iron water main and fittings, 50 linear feet of 12-inch zinc coated ductile iron water main and fittings,12- and 16-inch gate valves, removal of approximately 10 linear feet of 6-inch asbestos cement (AC) water main, and connection to 6-inch AC water main. The Contractor will be required to conduct this work as nightwork. It is the Contractors responsibility to review all local, state, and federal requirements for proper removal of AC pipe. Work includes, but is not limited to, the transfer of approximately 43 water services from the existing 6-inch cast iron water main to existing 16-inch ductile iron water main on North Main Street, Salem, NH between the Bluff Street and Main Street intersections. Work shall also include abandonment of existing 6-inch water main, removal of an existing hydrant, temporary paving, permanent trench paving, and surface restoration, where required. Work also includes installation of approximately 30 linear feet of 16-inch zinc coated ductile iron water main and fittings, 50 linear feet of 12-inch zinc coated ductile iron water main and fittings, 12- and 16-inch gate valves, removal of approximately 10 linear feet of 6-inch asbestos cement (AC) water main, and connection to 6-inch AC water main. The Contractor will be required to conduct this work as nightwork. It is the Contractors responsibility to review all local, state, and federal requirements for proper removal of AC pipe. Substantial Completion: October 15, 2023 Final Completion: May 15, 2024
Post-Bid
Water / Sewer
$300,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
