BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Salem, New Hampshire. Completed plans call for site work for a water / sewer project.

Work includes, but is not limited to, the transfer of approximately 43 water services from the existing 6-inch cast iron water main to existing 16-inch ductile iron water main on North Main Street, Salem, NH between the Bluff Street and Main Street intersections. Work shall also include abandonment of existing 6-inch water main, removal of an existing hydrant, temporary paving, permanent trench paving, and surface restoration, where required. Work also includes installation of approximately 30 linear feet of 16-inch zinc coated ductile iron water main and fittings, 50 linear feet of 12-inch zinc coated ductile iron water main and fittings,12- and 16-inch gate valves, removal of approximately 10 linear feet of 6-inch asbestos cement (AC) water main, and connection to 6-inch AC water main. The Contractor will be required to conduct this work as nightwork. It is the Contractors responsibility to review all local, state, and federal requirements for proper removal of AC pipe. Work includes, but is not limited to, the transfer of approximately 43 water services from the existing 6-inch cast iron water main to existing 16-inch ductile iron water main on North Main Street, Salem, NH between the Bluff Street and Main Street intersections. Work shall also include abandonment of existing 6-inch water main, removal of an existing hydrant, temporary paving, permanent trench paving, and surface restoration, where required. Work also includes installation of approximately 30 linear feet of 16-inch zinc coated ductile iron water main and fittings, 50 linear feet of 12-inch zinc coated ductile iron water main and fittings, 12- and 16-inch gate valves, removal of approximately 10 linear feet of 6-inch asbestos cement (AC) water main, and connection to 6-inch AC water main. The Contractor will be required to conduct this work as nightwork. It is the Contractors responsibility to review all local, state, and federal requirements for proper removal of AC pipe. Substantial Completion: October 15, 2023 Final Completion: May 15, 2024

Post-Bid

Water / Sewer

$300,000.00

Public - County

Site Work

8

13

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
127
Bidding Soon
2,612
All Active Projects
1,050
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2023

June 26, 2023

img_map_placeholder

To Be Determined, Salem, NH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.