BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

Project No.1 Plan File No. 52-5-82 Liquidated Damages, per diem: $1,000 The residency requirement for this project is 40% of all hours worked on the project. The SBE requirement for this project is 5% of the contract base bid. The Contractor shall start construction by July 17, 2023. All work shall be completed by December 15, 2023. The primary purpose of this project is to rehabilitate private sanitary sewer laterals that are known to be contributing sanitary wastewater to the City's storm sewer system. The selected properties are located at various locations throughout the City of Milwaukee. Additionally, some homes have lead water services which will be replaced with new copper water services. The properties included in this project were identified through the City's Storm Sewer Outfall testing program. Participation by the residents to have their sanitary sewer lateral reconstructed is voluntary and residents may opt out at any time. Residents who choose to participate are required to sign a Right of Entry consent form. Copies of all Right of Entry consent forms are available for viewing upon request. Once construction begins, the City has the option of obtaining consent from additional property owners that have not consented prior to the awarding of this contract. However, all additional consenting property owners are required to sign a Right of Entry consent form. The Contractor shall not solicit additional participation from the residents. 1. Lead Service Line The lead service line must be replaced with a minimum size of 1" type K-copper piping to replace 5/8", 3/4" or existing 1" service lines, 1-1/2" type K-copper piping to replace existing 1-1/4" or 1-1/2" service lines, and 2" type K-copper piping to replace existing 2" service lines, using approved lead free flared and/or compression fittings. MWW will provide the following materials through the permit process: o Stainless Steel Service saddle (required when tapping an unwrapped water main) o Corporation stop o Curb stop o Access box o Copper disk (for abandonment of lead service) o Service Insulator All other materials required to complete the LSL replacement must be supplied by the contractor. 2. Sanitary Sewer Lateral The sanitary sewer lateral must be replaced with a 6" polyvinyl chloride (PVC) or high density polyethylene (HDPE) pipe. PVC pipe installed between the sewer main connection and the foundation wall shall be SDR 35 PVC conforming to ASTM D3034 and shall have class "C" bedding. PVC pipe installed under the foundation wall, under the footings, and inside the house shall be Schedule 40 PVC.

Award

Water / Sewer

$1,448,585.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
98
Bidding Soon
2,394
All Active Projects
851
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 17, 2023

July 17, 2023

December 15, 2023

img_map_placeholder

Multiple Locations, Milwaukee, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.