BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Edmonton, Alberta. Completed plans call for site work for a municipal facility.

This project comprises of the replacement and refurbishment of the fountain, reflecting pool, and plaza decking at the Alberta Legislature grounds. TP #03 contains the main works scopes for Phase 1 of the project. Disclaimers and Information: Subcontractor to assume responsibility for all labour, materials for specific scope of work All quotations shall be valid for the duration of the Bid Validity period as noted in the Bid Documents Lowest tender not necessarily accepted Successful bidders will be required to sign EllisDon's Standard Form of Subcontractor Agreement All Bidders must apply and meet EllisDon's Subguard criteria on all contracts over $250,000. EllisDon is using Subcontractor Default Insurance (SDI) on this Project. This is an insurance product that replaces Subcontractor bonding. As SDI is being used on this Project; the bidder will not be required to provide a performance and payment bond, provided that the Subcontractor has successfully pre-qualified to EllisDon for enrollment into the insurance program. All Subcontracts with a subcontract value in excess of $250,000 must have Contract Performance Security in the form of an acceptance and rating from EllisDon. The rating from EllisDon must be equal to, or in excess of the subcontract amount, or the subcontractor will be required to supplement the security with alternate forms of security acceptable to EllisDon, at the Subcontractor's expense. The cost of Subcontractor Default Insurance for accepted Subcontractors is covered by EllisDon. All other costs of security are at the Subcontractor's expense. The EllisDon "Subcontractor Default Insurance PreQualification Application" will be sent to you by us electronically. The form is filled out on-line. Please contact EllisDon with the name and e-mail address of the person at your company who will be responsible for filling out this application form. View our 'Subcontractor's Bill of Rights' at www.ellisdon.com Subcontracts over $100,000 are required to use EllisDon's SUBcentre project management system; All contractors will be subject to a non-negotiable Gate Three fee.: For contracts between $100,000 - $1,000,000, the rate is $99.00/month; For contracts greater than $1,000,000, the rate is $1,200/year for the duration the contract until all payments been released. Official bid documents must be obtained from www.merx.com The project value listed reflects the total project estimate.

Post-Bid

Municipal

$1,300,000.00

Public - State/Provincial

Site Work

88

30

92

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
15
Bidding Soon
245
All Active Projects
90
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2023

July 31, 2023

img_map_placeholder

9804 107 St NW, Edmonton, AB


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.