BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2023 at 8:00 PM

Updated January 26, 2024

Site work and new construction of an educational facility in Fullerton, California. Completed plans call for the construction of a 19,300-square-foot educational facility; and for site work for a educational facility.

**As of September 18, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Liquidated Damages: $5,000.00 Project Durations:380 Calendar Days License Requirements: B The Project generally consists of a new 19,300 GSF donor-funded building for Leadership Training will to be located on Folino Drive, at the northeast corner of Mihaylo Hall. The building is to feature an Auditorium, Library and Archive, TV Studio, Boardroom, Training Room, and guest and staff offices. It will accommodate the centers initiatives including: visiting speakers, awards ceremonies, and professional consulting, as part of a broader vision for the next chapter of the College of Business and Economics as it continues to serve the community through transformative education, research, and engagement. The project is currently in schematic design, and the design firm is Steinberg Hart. Direct any prequalification questions to the Trustees Prequalification Administrator at cocm.prequal@calstate.edu. The Trustees shall give a small business a bid advantage of five percent to contracting firms that have been certified as a Small Business by the Department of General Services, Office of Small Business and DVBE Services, in accordance with Contract General Conditions (and Supplementary General Conditions) for Construction Manager at Risk with Guaranteed Maximum Price Projects, Article 2.08, Small Business Five Percent Bid Advantage. Additionally, the Trustees require three percent Disabled Veteran Business Enterprise (DVBE) participation in all contracts, in accordance with Contract General Conditions (and Supplementary General Conditions) for Construction Manager at Risk with Guaranteed Maximum Price Projects, Article 2.09-g, DVBE Incentive.

Award

Educational

$2,237,620.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
559
Active Projects
263
Bidding Soon
3,937
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2023

July 1, 2024

Project location map

To Be Determined, Fullerton, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.