BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in North Attleboro, Massachusetts. Completed plans call for the renovation of a power facility.

The Contractor is to furnish, deliver, install and connect, and make ready for operation all material and equipment furnished by the Owner and the Contractor as shown on the Plans and Specifications. All else remaining as indicated on the drawings becomes part of this Contract. This project will replace two 115 kV oil circuit breakers, 115 kV revenue metering instrument transformers and 115 kV disconnect switches and associated buswork. The work will progress in four phases: 1. Phase 1 - Preliminary Work a. Installation of two relay panels, five (5) meter sockets, two (2) white indicating lights, direct buried conduit, precast handhole. All existing substation equipment will remain energized during this phase. 2. Phase 2 - 115 kV Bus 3 Outage a. Removal and proper disposal of one 115 kV oil circuit breaker, five 115 kV revenue metering instrument transformers, one 115 kV gang operated disconnect switch and associated buswork, equipment support structures, foundations, conduit and cabling. b. Installation of one 115 kV circuit breaker, two 115kV motor-operated disconnect switches, three 115 kV metering units including associated foundations, structures, conduit, cabling, grounding and buswork. 115 kV Bus 1, 115 kV Bus 2, Transformer T1, Transformer T2 and the existing 13.8 kV distribution equipment will remain energized during this phase. 3. Phase 3 - 115 kV Bus 1 Outage a. Removal and proper disposal of existing control house, one 115 kV oil circuit breaker, five 115 kV revenue metering instrument transformers, one 115 kV gang operated disconnect switch and associated buswork, equipment support structures, foundations, conduit and cabling. b. Installation of one 115 kV circuit breaker, two 115kV motor-operated disconnect switches, three 115 kV metering units including associated foundations, structures, conduit, cabling, grounding and buswork. 115 kV Bus 2, 115 kV Bus 3, Transformer T2, Transformer T3 and the existing 13.8 kV distribution equipment will remain energized during this phase. The Contractor shall reach substantial completion on or before May 31, 2024, and final completion on or before July 15, 2024. The Contractor shall attain the following interim Milestone dates during construction: 115 kV Bus No. 3 ready for energization - December 31, 2023. 115 kV Bus No. 1 ready for energization - May 31, 2024.

Post-Bid

Power Plant

$1,000,000.00

Public - City

Renovation

31

12

18

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
582
Active Projects
360
Bidding Soon
4,588
All Active Projects
1,968
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 8, 2023

August 9, 2023

July 17, 2024

img_map_placeholder

280 Landry Ave, North Attleboro, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.