BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Turtle Lake, North Dakota. Completed plans call civil work for a parking garage and water / sewer project.

**As of July 7, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** A general overview of the scope of work is as follows: Contract No. 1 GENERAL CONSTRUCTION (LUMP SUM): Work generally consists of mobilization, bonding, and insurance for all Project Work shown on the civil, process, architectural, and structural drawings, including constructing a new administration area, new garage space, installation of pressure filter system, and renovations to the existing water treatment plant. Contract No. 2 MECHANICAL CONSTRUCTION (LUMP SUM): Work generally consists of mobilization, bonding, and insurance for all Project Work shown on the mechanical drawings, including new ventilation equipment, ducts, fans, plumbing, fixtures, heaters, air-conditioning, gauges, thermostats, pipe, fittings, valves, supports, anchors, vents, and all related appurtenances. Contract No. 3 ELECTRICAL CONSTRUCTION (LUMP SUM): Work generally consists of mobilization, bonding, and insurance for all Project Work shown on the electrical drawings including electrical labor, service-entrance equipment, trenching, excavation, cables, wiring, disconnect switches, lighting, conduits, fittings, boxes, panelboards, motor control centers, variable frequency drives, control panels, instrumentation and control devices, and all related electrical, instrumentation and control appurtenances as indicated. Contract No. 4 COMBINED CONSTRUCTION (LUMP SUM): Mobilization, bonding, and insurance for all general construction, mechanical construction, and electrical construction as described in Contracts No. 1 through 3. Separate Bids will be received for Contract No. 1 General Construction; Contract No. 2 Mechanical Construction; Contract No. 3 Electrical Construction, and Contract No. 4 Combined Construction. Bids shall be on a lump sum basis for Contract Nos. 1, 2, 3, and 4.

Bid Results

Water / Sewer

$415,900.00

Public - County

Renovation, Site Work

206

35

13

10

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
64
All Active Projects
17
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2023

July 3, 2023

img_map_placeholder

Multiple Locations, Turtle Lake, ND


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.