BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 30, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Copalis Beach, Washington. Completed plans call for site work for a water / sewer project.

Provide labor, materials, equipment and supervision for installation of a water main extension. The project includes Installation of approximately 130 feet of 8-inch HDPE casing pipe under State Route 109 using Horizontal Directional Drilling (HDD) methods and installation of approximately 180 feet of 4" HDPE water main, valves, water services and appurtenances. There is no pre-bid conference for this project. Please do not contact County staff on-site. Technical inquiries regarding the project should only be directed to Mike Olden, P.E., PLLC General project questions should be directed to John Sliva at Grays Harbor County via email only (jsliva@co.grays-harbor.wa.us).

Award

Water / Sewer

$135,036.00

Public - County

Site Work

6

8

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
1
Bidding Soon
290
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2023

June 22, 2023

Project location map

To Be Determined, Copalis Beach, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.