BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 22, 2023 at 8:00 PM

Updated January 26, 2024

Demolition and site work for a playground / park / athletic field in Las Vegas, Nevada. Completed plans call for the demolition of a playground / park / athletic field; and for site work for a playground / park / athletic field.

The "Project" of which the "Work" of the Contract is a part titled "Paradise Park Pool Water Slide Replacement and is located at 4775 McLeod Drive, Las Vegas, Nevada 89121 The "Work" is described in the Project Drawings and Divisions 01 through 32 of the Project Manual. The Work consists of the demolition and removal of an existing pool slide assembly, structural supports, foundations, and area drains within the slide assembly area. The new work consists of an installation of a new pool slide assembly, structural supports, new drains, and concrete decking for the area of work. Additional work by the contractor includes engineering, permitting, material and labor for the new pool slide assembly. Permit drawings for the new slide assembly shall conform to ADA standards and be provided by contractor and submitted CCBD as a separate permit submittal. Existing pool to be protected from construction debris throughout the construction duration. Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: Removal of existing concrete decking, footings and slide supports of existing slide assembly within the project area. Existing shade canopy to be temporarily removed and protected to be reinstalled after completion of slide assembly. New deck drains and concrete support piers to be installed for new slide assembly. Construction also includes a concrete deck and finish coat to be installed to match existing finish within the project area. New slide assembly to be installed, tested, and inspected by all required authorities.

Award

Playgrounds / Parks / Athletic Fields

$766,607.00

Public - County

Demolition, Site Work

16

19

2

6

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
32
Bidding Soon
431
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

August 25, 2023

Project location map

4775 McLeod Dr, Las Vegas, NV


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.