Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Keene, New Hampshire. Completed plans call for site work for a water / sewer project.
The purpose of the Wilson Pond Dam Improvement Project is to reconstruct a portion of the existing dam so that it meets current dam safety regulations, which includes the ability to pass the 100-year flood event with a minimum of 1.0-feet of freeboard. In order to do so, this project consists of the excavation and removal of material on both the upstream and downstream sides of the existing dam, the demolition and installation of a new cast-in-place intake structure and reinforced concrete outlet pipe, the installation of a concrete hydraulic cut-off wall upstream of the original stonewall dam, raising of the earthen portions of the dam to contain the design flood, and the placement of a granular filter on the downstream side of the earthen portions of the dam. The project also includes traffic control measures on Arch Street. Two (2) lane travel is required at all times, and NHDOT approved traffic control measures are required. The Contractor is responsible for traffic control and shall prepare a traffic control plan, then coordinate with the NHDOT to review and obtain approval of the traffic control plan from NHDOT prior to mobilization. The control of water, including the bypass of discharges through the project site and into the downstream channel is required at all times. All construction shall be performed in the dry. Contractor shall submit a specific control of water plan to the Engineer and NHDES for review and approval prior to mobilization. Each BID must be accompanied by a certified check payable to the OWNER for five percent (5%) of the total amount of the BID. A BID BOND may be used in lieu of a certified check The anticipated Notice of Award is scheduled for May 31,2023 and the Notice to Proceed/Preconstruction Meeting will be scheduled for June 12,2023. Substantial Completion is October 4, 2023, and the date of readiness for final payment is November 8, 2023, a
Bid Results
Water / Sewer
$777,100.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 31, 2023
June 19, 2023
To Be Determined, Keene, NH
Related To This Project
Keene, NH
Bid Date: May 30 2023
Keene, NH
--
Keene, NH
Bid Date: Jun 22 2023
Keene, NH
Bid Date: Jul 05 2023
Keene, NH
--
Keene, NH
Bid Date: Jun 16 2023
Keene, NH
Bid Date: Jun 07 2023
Keene, NH
Bid Date: Mar 15 2022
Keene, NH
--
Keene, NH
Bid Date: Apr 28 2023
Keene, NH
Bid Date: Apr 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.