Site work for a water / sewer project in Max, North Dakota. Completed plans call for site work for a water / sewer project.
Construction of a new Northwest Area Water Supply (NAWS) raw water transmission pipeline segment, connection to NAWS discharge pipeline outside an existing Snake Creek Pumping Plant (SCPP) discharge structure (discharge pipeline connection will require coordination with another Contract completing the pipe penetration through the existing discharge structure wall), construction of a cast-in-place concrete isolation valve vault, connection to the existing NAWS raw water transmission pipeline, and other miscellaneous work. Work for the NAWS discharge pipeline involves a connection to piping being constructed under a separate contract, Installation of approximately 2,200LF of buried 36" restrained-joint ductile iron pipe (Owner Provided pipe and fittings) along US HWY 83 of which approximately 1,400LF must be encased in reinforced concrete with expansion joints, thrust block and connection to the existing NAWS raw water transmission pipeline north of SCPP, and construction of an isolation valve vault with electrical, controls, SCADA systems, and high pressure piping and valves, (Owner Provided Isolation Valve Vault wall pipe). The Contractor will not perform Work or permit the performance of Work by subcontractors outside regular dawn to dusk working hours or on Saturdays, Sundays, or legal State holidays without providing written notice of proposed Work to the Engineer a minimum of 5 days in advance and contingent on the Owner's written consent. Milestone 1 - Construction of Underground Pipeline shall be completed by January 30, 2024. Substantial Completion for all WORK shall be June 30, 2024. Final Completion for all WORK shall be September 30, 2024. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing, questions may also be submitted electronically to the Project Management Team: Alan Kemmet, akemmet@houstoneng.com or Ryan David, rdavid@houstoneng.com Question Deadline 05/18/2023
Post-Bid
Water / Sewer
$6,500,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2023
August 5, 2023
To Be Determined, Max, ND
Related To This Project
Max, ND
Bid Date: Oct 31 2024
Max, ND
Bid Date: Oct 16 2025
Grafton, ND
Bid Date: Dec 23 2025
Minot, ND
Bid Date: May 19 2023
Fargo, ND
Bid Date: May 26 2023
Fargo, ND
Bid Date: Jun 08 2023
Mandan, ND
Bid Date: Jun 06 2023
Minot, ND
Bid Date: May 09 2023
Bismarck, ND
Bid Date: Jun 08 2023
Bismarck, ND
Bid Date: May 24 2023
Minot, ND
Bid Date: Jun 26 2023
Fargo, ND
Bid Date: May 24 2023
Cavalier AFS, ND
Bid Date: May 19 2023
Minot, ND
Bid Date: May 30 2023
Devils Lake, ND
Bid Date: May 08 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.