Published June 7, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Max, North Dakota. Completed plans call for site work for a water / sewer project.

Construction of a new Northwest Area Water Supply (NAWS) raw water transmission pipeline segment, connection to NAWS discharge pipeline outside an existing Snake Creek Pumping Plant (SCPP) discharge structure (discharge pipeline connection will require coordination with another Contract completing the pipe penetration through the existing discharge structure wall), construction of a cast-in-place concrete isolation valve vault, connection to the existing NAWS raw water transmission pipeline, and other miscellaneous work. Work for the NAWS discharge pipeline involves a connection to piping being constructed under a separate contract, Installation of approximately 2,200LF of buried 36" restrained-joint ductile iron pipe (Owner Provided pipe and fittings) along US HWY 83 of which approximately 1,400LF must be encased in reinforced concrete with expansion joints, thrust block and connection to the existing NAWS raw water transmission pipeline north of SCPP, and construction of an isolation valve vault with electrical, controls, SCADA systems, and high pressure piping and valves, (Owner Provided Isolation Valve Vault wall pipe). The Contractor will not perform Work or permit the performance of Work by subcontractors outside regular dawn to dusk working hours or on Saturdays, Sundays, or legal State holidays without providing written notice of proposed Work to the Engineer a minimum of 5 days in advance and contingent on the Owner's written consent. Milestone 1 - Construction of Underground Pipeline shall be completed by January 30, 2024. Substantial Completion for all WORK shall be June 30, 2024. Final Completion for all WORK shall be September 30, 2024. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing, questions may also be submitted electronically to the Project Management Team: Alan Kemmet, akemmet@houstoneng.com or Ryan David, rdavid@houstoneng.com Question Deadline 05/18/2023

Post-Bid

Water / Sewer

$6,500,000.00

Public - State/Provincial

Site Work

114

44

15

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
0
Bidding Soon
99
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2023

August 5, 2023

Project location map

To Be Determined, Max, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.