EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 28, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a fire / police facility in Oklahoma City, Oklahoma. Completed plans call for the renovation of a fire / police facility.

The Consulting Architect or Consulting Engineer is responsible for reviewing the Claim Voucher, questioning and correcting any exceptions, executing the Certificate and forwarding the forms to the Oklahoma City Airport Trust at okcatap@okc.gov. SCOPE OF THE WORK The CONTRACTOR shall furnish all materials and perform all work shown on the Drawings and described in the Project Manual, including addenda thereto, which are incorporated into this Contract as if fully set forth herein, and which are entitled: : Project No. OCAT WRWA 2310 Headquarters Building Envelope Repairs Mike Monroney Aeronautical Center hereinafter called the "PROJECT," as prepared by C.H. Guernsey & Company (Guernsey) ("ARCHITECT/ENGINEER"), and shall do everything required by this CONTRACT. The bidding on and supervision of construction of this CONTRACT shall be under the supervision of the ARCHITECT/ENGINEER. ARTICLE 2: TIME OF COMPLETION The work to be performed under this CONTRACT shall be commenced on the first day after a written "Notice to Proceed" is issued from the TRUST, by and through the Director of Airports, and shall obtain Final Acceptance by the TRUST within One Hundred and Eighty Days (180) calendar days ("Time of Completion"). The estimated completion date is _December 19, 2023, but the actual completion date will be based on the number of calendar days from the date of the Notice to Proceed

Post-Bid

Fire / Police

$549,243.00

Public - City

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Stairs, Metal Ladders
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Preparation for Re-Roofing, Membrane Roofing, Modified Bituminous Membrane Roofing, Joint Protection, Preformed Joint Seals, Backer Rods, Expansion Control
Division 09 - Finishes

Division 09 - Finishes

Ceilings
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
37
Bidding Soon
491
All Active Projects
236
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2023

July 28, 2023

img_map_placeholder

6424 S MacArthur Blvd, Oklahoma City, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Headquarters Building Envelope Repairs Mike Monroney Aeronautical Center

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.