BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Waco, Texas. Contact the soliciting agency for additional information.

The contractor shall be responsible for providing all labor, materials and equipment required for the services to pump out 3 grease traps and 1 grit trap. The grease traps that need to be pumped out are in buildings 4, 91, 202 and the grit trap that needs to be pump is at the car wash station outside of Building 226. The contractor will perform these services quarterly and provide the VA COR or Alternative COR with the inspection reports after traps are cleaned. All work performed will be done at the Doris Miller VAMC in Waco, at Buildings 4, 91, 202, and 226 at 4800 Memorial Drive, Waco, Texas 76711. After all work is completed, the contractor will have a walkthrough with a VA representative to ensure all work is completed and ready for invoicing. The contractor shall provide all personnel, services, vehicles, transportation, tools, equipment, materials, supplies, facility supervision, administration supervision and any other item(s) necessary to perform and accomplish this service. The contractor shall be familiar with all the terms, conditions, and requirement herein contained. All disposals must comply with federal, state and local regulations for hazmat disposal. All work shall be done according to the Infection Control Risk Assessment (ICRA) specified for the respective areas where work is performed. Note: "The C&A requirements do not apply, and that a Security Accreditation Package is not required for this contract." Project Requirements Pumping Process - Base Buildings 4, 91, 202, and 226 1. Thoroughly inspect all grease traps and grit trap before the start of work. 2. Pump all grease traps in Canteen Services in Buildings 4 and 202. 3. Use a degreaser on all grease traps and remove piping if necessary to get any excessive grease when cleaning. 4. Pump the grit trap outside of Building 226. 5. Degrease trap with non-biohazard chemical when pumping out and cleaning. 6. After completion haul off all debris, remove all material waste from grease traps and grit trap, and dispose of them properly per OSHA guidelines and standards. 7. After job is complete the VA COR or Alternative will perform a final walk-through to ensure the contract has been met per VA standards and payment is ready to receive invoicing. 8. Perform grease and grit trap maintenance 4 times per year (Quarterly). 9. The contract with consist of a base plus 4 option years with quarterly maintenance done 4 times per year. 10. Contractor will need to submit inspection reports to the City of Waco and VA Engineering Department to keep on file of services performed on grease and grit traps. 11. Traps: a. Building 4 - 10 gallons b. Building 91 - 10 gallons c. Building 202 - 2,000 gallons d. Outside Building 226 - 800 gallons

Post-Bid

Medical

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
31
Bidding Soon
1,216
All Active Projects
428
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.