BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Tabernacle, New Jersey. Completed plans call for the renovation of a educational facility.

Contract(s): Single Overall Contract (DPMC: C032 Prime with C009 & C047 Subcontractors) Project Description: The Base Bid at includes, but is not limited to the following: Kenneth R. Olson Middle School: Removal and replacement of HVAC equipment including, but not limited to, rooftop air conditioning units, air handling units, ductwork, piping, insulation, finned tube radiation, unit heaters, convectors, exhaust fans, make-up air units, condensing units, valance units, variable air volume boxes, unit ventilators, automatic temperature controls, air balancing, water balancing and air devices. New concrete pads, bollards and fencing. Tabernacle Elementary School: Removal and replacement of HVAC equipment including, but not limited to, rooftop air conditioning units, air handling units, finned tube radiation, unit heaters, convectors, exhaust fans, make-up air units, condensing units, variable air volume boxes, unit ventilators, automatic temperature controls, air balancing, water balancing and air devices. New concrete pads. Project Locations: 132 New Road, Tabernacle, New Jersey 08088 and 141 New Road, Tabernacle, NJ 08088 Alternate Bid(s): Alternate Bid No. 1: Unit Ventilator Removal in Room #'s B43, B44, B45, B46, B66 & B67 at Kenneth R. Olson Middle School Alternate Bid No. 2: Chiller #1 and #2 Replacement, including Pumps P-1 and P-2 at Kenneth R. Olson Middle School Estimated Project Cost: $4,000,000.00 FVHD Contact: All request for information must be submitted in writing by May 18, 2022 and emailed to cwoodward@fvhdpc.com or by faxing 609.883.2694. All correspondence must include the Architect Project Name and Number. Additional Information: Physical Start on or about July 5, 2023. Substantial Completion: August 23, 2024. Final Completion: September 24, 2024 All requests for information (RFI) must be submitted in writing by May 18, 2022, and sent to emailing cwoodward@fvhdpc.com, or by faxing to 609-883-2694 or via common carrier to the Architect.

Award

Educational

$5,980,000.00

Public - City

Renovation

38

19

9

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
22
Bidding Soon
3,563
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2023

July 5, 2023

Project location map

Multiple Locations, Tabernacle, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.