BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in Lincoln, Nebraska. Completed plans call for the renovation of a multi-residential development.

PROJECT DESCRIPTION Project consists of removing and replacing an exterior electrical receptacle. Extend outlets to meet new depth of siding boxes. Install new weather resistant GFCI outlet, extra duty in use cover, and weatherproof extension box at 38 units, per the following Specifications. Lincoln Housing Authority standard purchase order conditions will apply (see attached). SECTION 01 00 00 - GENERAL 1. Proposal: Provide proposal on Contractor's standard form. Provide pricing to perform work shown on the attached Drawings C1.1, A1.1, and A1.2. Proposal shall reference these Bid/Construction documents. 2. Review of Site and Documents: Determine that the Work can be executed as shown on the Drawings and in the Specifications. Notify the Architect immediately of any discrepancies. If any errors or omissions are found in the Drawings or any other documents during bidding or construction, the Contractor shall notify the Architect and request clarification before proceeding with the Work. 3. Purchase Order Terms & Conditions: The written agreement shall be a Lincoln Housing Authority purchase order. Payment will be made in one lump sum after all work is completed. LHA Purchase Order Terms & Conditions 1 through 11 will apply as attached below. Some material submittals will be required. 4. Insurance: Before starting any work, the Contractor shall furnish LHA with a certificate of insurance showing the minimum insurance coverage as described below is in force. 5. Contractors Responsibility for Work: The Contractor shall supervise and direct the Work, using the Contractor's best skill and attention. The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work. The Contractor shall enforce strict discipline and good order among the Contractor's employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them. Protect the Work, adjoining property, and the public. The Contractor shall be responsible for any and all damage or injury due to his acts or neglect. Furnish all such repair work to rectify any damage at no extra cost to the Owner. 7. Construction Schedule: Work on site may be performed between 8:00 AM and 5:00 PM, on weekdays only (Monday-Friday). No work to be done on Juneteenth, July 4th, or Labor Day. Complete work in the least practical amount of time. Provide notice to tenant at least 2 days before starting (LHA can provide pre-printed notices for you to post) indicating date and time that you intend to perform the work. Communicate with tenant if any interruption to power in their unit is expected and when it may be expected. Inform Owner's representative of work schedule (LHA Project Coordinator Bob Goggins at 402-429-9616). 8. Temporary Facilities & Controls: Provide signs and/or barricades as may be required to protect tenant family members. 9. Cleaning: Keep the site clean. Take all measures required to keep dust and debris from causing damage in occupied areas. Clean up and remove work related trash immediately upon completion of each work activity. Upon final completion, clean to condition before work began. SITE LIST Site Address Notes 1. 5001 W Superior One outlet to be replaced at rear patio 2. 5007 W Superior One outlet to be replaced at rear patio 3. 5101 W Superior One outlet to be replaced at rear patio 4. 5107 W Superior One outlet to be replaced at rear patio 5. 5121 W Superior One outlet to be replaced at rear patio 6. 5115 W Superior One outlet to be replaced at rear patio 7. 5200 W Vance One outlet to be replaced at rear patio 8. 5206W Vance One outlet to be replaced at rear patio 9. 5321 W Vance One outlet to be replaced at rear patio 10. 5333 W Wilkins One outlet to be replaced at rear patio 11. 5327 W Wilkins One outlet to be replaced at rear patio 12. 5233 W Wilkins One outlet to be replaced at rear patio 13. 4224 NW 50th One outlet to be replaced at rear patio 14. 4230 NW 50th One outlet to be replaced at rear patio 15. 5001 W Vale One outlet to be replaced at rear patio 16. 5007 W Vale One outlet to be replaced at rear patio 17. 5106 W Metzger One outlet to be replaced at rear patio 18. 5100 W Metzger One outlet to be replaced at rear patio 19. 5101 W Metzger One outlet to be replaced at rear patio 20. 5107 W Metzger One outlet to be replaced at rear patio 21. 5007 W Metzger One outlet to be replaced at rear patio 22. 5001 W Metzger One outlet to be replaced at rear patio 23. 5030 W Elba One outlet to be replaced at rear patio 24. 5024 W Elba One outlet to be replaced at rear patio 25. 5000 W McGuire One outlet to be replaced at rear patio 26. 5006 W McGuire One outlet to be replaced at rear patio 27. 4030 NW 49th One outlet to be replaced at rear patio 28. 4024 NW 49th One outlet to be replaced at rear patio 29. 4201 NW 49th One outlet to be replaced at rear patio 30. 4207 NW 49th One outlet to be replaced at rear patio 31. 3827 NW 51st One outlet to be replaced at rear patio 32. 3833 NW 51st One outlet to be replaced at rear patio 33. 3721 NW 53rd One outlet to be replaced at rear patio 34. 3715 NW 53rd One outlet to be replaced at rear patio 35. 5301 W Luke One outlet to be replaced at rear patio 36. 5307 W Luke One outlet to be replaced at rear patio 37. 4027 NW 54th One outlet to be replaced at rear patio 38. 4021 NW 54th One outlet to be replaced at rear patio *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Multi-Residential

$7,020.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
30
Bidding Soon
486
All Active Projects
194
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2023

June 15, 2023

img_map_placeholder

To Be Determined, Lincoln, NE


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.