BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bouse, Arizona. Completed plans call for site work for a water / sewer project.

The Central Arizona Water Conservation District reserves the right to require complete, certified copies of all insurance policies required by this Contract at any time. CAWCD is requesting bids from vendors to update the current septic system at CAP's Bouse Hills Pumping Plant. The CAP is designed to bring about 1.5 million acre-feet of Colorado River water per year to Pima, Pinal and Maricopa counties. The CAP carries water from Lake Havasu to the southern boundary of the San Xavier Indian Reservation southwest of Tucson. It is a 336-mile long system of aqueducts, tunnels, pumping plants and pipelines and is the largest single resource of renewable water supplies in the state of Arizona. All questions shall be addressed to Maria Cerda (623) 869-2490 or by email to mcerda@cap-az.com. Complete a CAP dig permit. Confirm all power and controls circuits feeding the existing lift station are locked open. Demo the submersible pumps, float switches, wiring, and piping in the western most chamber of the septic tank. o Demo all wiring between the tank and the control panel within the plant (located on level 4, near the control room). There will be 6 power conductors (2 pumps) and 7 control conductors (float switches). Install a new NEMA 3R outdoor rated enclosure on the southwest side of the building, near the septic tank. This enclosure is going to be used as a junction box and power disconnect. o Install enough terminal-boards to be able to land at least 13 circuits. Probably two, 10 terminal terminal-boards will be required. Intercept existing 1" electrical conduit between the plant building and tank. Cutconduit near concrete walking pad. Connect and route an extension conduit to the side of the building to new junction box. Install and route new 1" conduit between new junction box and new tank control panel. Pull new power (12AWG) and control (14AWG) conductors, both with XHHW-2 insulation, between new junction box and existing control panel in the plant (level 4 near control room). o 15 conductors, approximately 200ft long. Pull new power (12AWG) and control (14AWG) conductors, both with XHHW-2 insulation, between new junction box and the new tank control panel. o 15 conductors, approximately 50ft long.

Award

Water / Sewer

$134,288.00

Public - State/Provincial

Site Work

6

9

10

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
20
All Active Projects
8
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.