EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 22, 2023 at 8:00 PM

Updated October 1, 2024

Site work, paving and outdoor lighting for a mixed-use development in Bay Minette, Alabama. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a playground / park / athletic field.

The scope of work generally includes the following principal elements: Construction of Approximately 4,060 Yd2 Parking Lot Construction of 150' x 125' Soccer Field with irrigation Construction of 360' x 240' Soccer Field with irrigation Installation of Sports Lighting and Appurtenances Installation of 1,000 of Chain Link Fence Guarantee will be required with each bid for at least 5% of the amount of bid filed in the form of a certified check or bid bond payable to the City of Bay Minette. Bid Bonds shall include certification that the bonding company is listed in Circular 570 of the U. S. Treasury Department and is authorized to do business in the State of Alabama. The name, address, telephone number, and contact person for the bonding company shall also be included. A Performance Bond, in the form and terms approved by the City of Bay Minette and in an amount not less than the total amount bid, shall be required prior to Contract execution. Contractor shall furnish prior to Contract execution a certificate of insurance coverage as provided in the Specifications which will include Comprehensive Insurance, Contractor's Automobile Liability Insurance, Owner's Protective Liability Insurance, and where applicable, subcontractor's Public Liability and Property Damage Insurance. All nonresident contractors preparing bids shall submit with the bid documents evidence of a current Alabama Business License, evidence of proper registration with the Alabama Secretary of State (with original seal of the State ofAlabama), as a foreign corporation, and a Certificate of Good Standing as a Foreign Corporation from the State Department of Revenue. Bids submitted by a nonresident contractor without these documents included will be rejected. All bidders must comply with the Presidents Executive Order Number 11246 which prohibits discrimination in employment regarding race, creed, color, sex or national origin. All Bidders must comply with Title VI of the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti Kickback Act and the Contract Work hours Act. The attention of Bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the Contract. The right is reserved, as the interest of the Owner may require, to reject any and all bids, to waive any informalities in bids received, and to award in its best interests.

Post-Bid

Playgrounds / Parks / Athletic Fields

$5,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
28
Bidding Soon
411
All Active Projects
197
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2023

July 25, 2023

img_map_placeholder

To Be Determined, Bay Minette, AL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Soccer Complex

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.