BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 2, 2023 at 8:00 PM

Updated January 26, 2024

Site work and renovation of a playground / park / athletic field in Spokane, Washington. Completed plans call civil work for a playground / park / athletic field.

PROJECT SUMMARY: This locally funded public works project consists of constructing transit center infrastructure and platforms to include traffic control, demolition, grading, concrete placement, asphalt paving, stormwater infrastructure, electrical, landscaping, and installation of signage. Estimated value: $600k - $700k *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project shall generally consist of: 1. Obtain and pay for building and obstruction permits and fees as required for the scope of work. These permit fees will be reimbursable paid to the contractor by STA with no markup, refer to Section 002100 - Instruction Bidders -1.3b 2. All other permits are the responsibility of the contractor, refer to Section 007200.1 - General Conditions - 5.02 3. Perform and coordinate thorough public utility locates to complete the scope of work 4. Generate and submit a Submittal Register for review and approval by STA 5. Furnish, setup, and maintenance of approved traffic control 6. Demolition and grading per plans and specifications 7. Furnish and install bus stop sign posts per plans and specifications 8. Placement of concrete for roadway, sidewalks, and bus stops per plans and specifications 9. Remediation of adjacent irrigation and landscaping as required by the scope of work 10. All other work as shown and specified in the contract plans and specifications 11. Contractor responsible for ensuring the safety and security of project work sites as necessary during construction. 12. Contractor is responsible for any and all necessary erosion control measures required to complete the scope of work 13. Contractor responsible for reviewing all plans and specifications applicability to each bas bid item. Furnish & installation of platform amenities including shelters, markers, light poles, leaning rails, benches, and garbage bins Furnish and installation of bus stop flag PROJECT LOCATION South Hill Park & Ride, 2502 E 31st Ave, Spokane, WA, 99223 Completion- (150) DAYS

Award

Playgrounds / Parks / Athletic Fields

$709,900.00

Public - City

Renovation, Site Work

23

7

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
24
Bidding Soon
318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2023

August 1, 2023

Project location map

1230 W Boone Ave, Spokane, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.