BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in West Bloomfield, Michigan. Completed plans call for the renovation of a educational facility; and educational facility.

Remove and Replace the Roofs On WBHS Area Y & Doherty Elementary Area I Sealed lump sum proposals will be received by West Bloomfield Schools ACS building at 5810 Commerce Road, West Bloomfield, MI 48324 on or before May 19th until 10 a.m. The bids will be opened and read publicly at that time. Proposals are to be contained in an opaque sealed envelope, which shall be identified as "SEALED BID - 2023 ROOF REPLACEMENTS - WEST BLOOMFIELD SCHOOLS", on the face of the envelope. West Bloomfield High School 4925 Orchard Lake Rd West Bloomfield, Michigan Doherty Elementary School 3575 Walnut Lake Road West Bloomfield, Michigan Each proposal must be accompanied by a Bid Security in the amount of five percent (5%) of the base proposal executed by an approved Surety Company or a certified check for the same amount made payable to West Bloomfield Schools. The bid security shall remain in effect for a period of sixty (60) days from date of bid opening. The bid bond or check delivery is conditioned to secure West Bloomfield Schools from loss or damage by reason of the withdrawal of the bid or by the failure of the bidder to enter a contract for performance if the bid is accepted by the Owner. Bidders may not alter, withdraw or cancel their bid or any part thereof for sixty (60) days after the time designated for receipt of the bids stated above. Successful bidders for work in excess of $50,000 will be required to provide Payment and Performance Bonds in the amount of 100% of their bid, issued by sureties listed by the U.S. Treasury Department and licensed to do business in Michigan. There will be a mandatory Pre-Bid Conference at 2:00 p.m. on May 8th at West Bloomfield High School. A roof walkthrough will be held immediately after at Doherty Elementary School. The Owner reserves the right to accept or reject any total bid, or part thereof, and to award the total contract or part thereof to other than the low bidder. All decisions regarding contract awards will be final. SCHEDULE: The roofing work shall begin no sooner than June 27, 2023 and be completed by August 25th, 2023.

Award

Educational

$700,000.00

Public - City

Renovation

4

14

5

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
71
Bidding Soon
1,403
All Active Projects
556
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2023

June 27, 2023

img_map_placeholder

Multiple Locations, West Bloomfield, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.