BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 10, 2023 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Victoria, British Columbia. Contact the soliciting agency for additional information.

The Contractor is responsible to provide all the required labour, materials, tools, equipment and incidental necessary for the HVAC repairs and maintenance services described herein. There three types of services are listed as followed: a) Scheduled preventative maintenance, b) Emergency and non-emergency repairs to restore the operations of HVAC systems, and c) As-and-when requested technical consultation related to BC Transit’s HVAC systems. The Contractor must ensure its compliance to all the applicable government regulations related to health and safety, including Appendix H - BC Transit Contractor Safety Program (attached). This program may be updated and notified by BC Transit during the Term. The Contractor must ensure that its’ assigned staff members attend and successfully pass the applicable safety orientation/training of BC Transit prior to commencement of the work. The labour costs during the time of such training must be at the expense of the Contractor. All equipment and materials must be suitable for the purposes intended and must not be harmful to the environment. They must be used in the manner specified by the manufacturers and must be brought onto the premises in the manufacturers’ original containers. The equipment/vehicle(s) must be in compliance with the Provincial Motor Vehicle Act / BC Motor Vehicle Act Regulations and/or Commercial Transport Act / Commercial Transport Regulations where applicable. Quality control is the Contractor’s responsibility. In all instances where BC Transit’s property or equipment is damaged by the Contractor, the Contractor must submit to BC Transit, or designator a full report of the incident and extent of the damage – verbally immediately of the occurrence and a written follow-up report within 24 hours of the occurrence. The Contractor must comply with all WSBC regulations and other regulatory agency requirements for record keeping and reporting of all accidents resulting in death, trauma, or occupational illness. The Contractor must provide a verbal report to BC Transit within one hour of occurrence and a written follow-up report within 24 hours of the occurrence. Contractor is responsible to contact BC One Call before digging, excavation or other works in proximity to gas lines, pipelines, cables, water lines, power lines and other public utilities. BC Transit reserves the right to contact the client contact persons provided for reference checking. Clarification Deadline 2:00:00 pm PST 23 May, 2023 The term of the agreement is to be for a period of three (3) years, with an option in favour of BC Transit to extend the agreement on the same terms and conditions for an additional term of up to two (2) additional two years terms.

Post-Bid

Municipal

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
305
Active Projects
119
Bidding Soon
2,928
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2023

July 5, 2023

Project location map

To Be Determined, Victoria, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.