BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in New Orleans, Louisiana. Completed plans call for site work for a water / sewer project.

All Bids must be in accordance with the Bidding Documents on file with and issued by Linfield, Hunter, & Junius, Inc Question Deadline 05/23/2023 at 9:00 AM CT The deadline to submit technical questions before bid opening All questions regarding the project, plans, or specification shall be in Writing and will be answered in Addenda. For general information or for questions related to bidding, please contact: I I I I I I I I I Please be advised that this individual is not the legal representatives of the FPA. I I I I Preconstruction Contact Information Page 1 of 1 I All questions regarding the project, plans, or specification shall b The Owner reserves the right to reject any and all bids for just cause. In accordance with La. R. S. 38:2212, the provisions and requirements of this Section, those stated in the advertisement for bids, and those required on the bid form shall not be considered informalities and shall not be waived by any public entity. Bids must be submitted on forms provided by the Owner. Envelopes containing bids and bid guarantee shall be sealed, marked with the project name, and with the Contractors name as it appears on the License and the Louisiana Contractors license number The work consists of furnishing all labor, material, and equipment for construction of new reinforced concrete drain pipe, manholes and drop inlets, clearing and grubbing, and regrading of the project site, as well as any related and incidental materials and work, as per the drawings and specifications provided in this bid document. The site is located on the south side of the rail road that runs along Hayne Blvd. beginning approximately 225 feet east of France Rd. to Congress Blvd. in New Orleans, Louisiana. The opinion of probable construction costs for the project will be made available at the time of bid opening, either by posting such estimate electronically or announcing aloud such estimate at the bid opening. The FPA make no assertion that all bid documents, addenda, etc. are available online. It is the responsibility of the bidder to ensure they have all said documents via the directions spelled out above. Any addenda, documents, Q&A, etc. that are available after this letting are only available via the contact listed above and will be issued to the Official Plan Holder list, maintained by said contact. If a request for Contract documents is made through U.S. mail or other delivery services, bidder must furnish a street mailing address and will be responsible for service and postage fees. All bids must be accompanied by bid security equal to five percent (5%) of the cost of the Contract price of work to be done for the Base Bid plus all additive Alternate Bid prices, by certified check, cashier's check or Bid Bond Form written by a surety company licensed to do business in Louisiana, signed by the suretys agency or attorney-in-fact. The Bid Bond shall be in favor of the following, as applicable: Southeast Louisiana Flood Protection Authority East (for all Projects) and Orleans Levee District The Bid Bond shall be accompanied by appropriate power of attorney. No Bid Bond indicating an obligation of less than five percent (5%) by any method is acceptable. The bidder to whom the Contract is awarded shall also be required to furnish a performance bond equal to 100% of the total amount of the bid. The bid bond must be furnished in accordance with the requirements of La. R.S. 38:2218, and the performance bond in accordance with the provisions of La. R.S. 38:2219. The furnished Payment and Performance bond shall be at no cost to the FPA. Bidder is required to comply with provisions and requirements of La. R.S.38:2212. Bids may be withdrawn or revised by the bidder prior to bid opening. Bids may only be withdrawn after bid opening due to patently obvious, unintentional, and substantial mechanical, clerical, or mathematical errors, or errors of unintentional omission of a substantial quantity of work, labor, material, or services made directly in the compilation of the bid, if clear and convincing sworn, written evidence of such errors is furnished to the public entity within48 hours of bid opening in accordance with La. R. S. 38:2214.

Award

Water / Sewer

$504,154.00

Public - State/Provincial

Site Work

22

9

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
50
Bidding Soon
511
All Active Projects
231
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2023

June 29, 2023

img_map_placeholder

Hayne Blvd,, New Orleans, LA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.