Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 5, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a playground / park / athletic field in Forest, Mississippi. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.
The work generally consists of constructing a 1,324-foot long asphalt walking trail in Edgewood Park in McComb, MS. Specific locations and improvements are shown in the Contract Drawings. The above general summary of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment, and materials required by the specifications and the drawings referred to therein. Contract time shall be 90 calendar days from the effective date shown in the Notice to Proceed. Liquidated damages will be assessed at a rate of $200.00 per day for each consecutive calendar day the work has not achieved Substantial Completion. The Owner reserves the right to waive any formalities or to reject any and all bids. A 5% bid bond will be required on this project. The successful bidder shall furnish a Performance Bond and a Payment Bond each in the amount of 100% of the bid. Attorneys-in-fact who sign Payment Bonds must file with each bond a certified and effective dated copy of their power of attorney.
Post-Bid
Playgrounds / Parks / Athletic Fields
$100,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2023
July 5, 2023
To Be Determined, Forest, MS
Related To This Project
Forest, MS
Bid Date: Jun 06 2023
Forest, MS
Bid Date: Jun 08 2023
Forest, MS
Bid Date: Jul 14 2023
Forest, MS
Bid Date: Jun 20 2023
Forest, MS
Bid Date: Jun 15 2023
Forest, MS
Bid Date: Jun 27 2023
Forest, MS
Bid Date: Jun 19 2023
Forest, MS
Bid Date: Jun 08 2023
Forest, MS
Bid Date: May 11 2023
Forest, MS
Bid Date: Jun 06 2023
Forest, MS
Bid Date: Jun 14 2023
Forest, MS
Bid Date: May 02 2023
Forest, MS
--
Forest, MS
--
Forest, MS
Bid Date: Dec 02 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
