BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Elizabeth, Illinois. Working plans call for the renovation of a fire / police facility.

As of June 01, 2023, no bids were received, no information for rebid. Project Overview The Village of University Park has experienced exponential growth within the I-57 Industrial Corridor. As such, the Village's secondary fire station located within this area has seen a significant increase in demand for services. As a result, the existing driveway has begun to rapidly deteriorate and based on PAVER rating methodologies, is in failed condition. This project would include the removal and disposal of existing materials and replacement of materials as specified in the scope of work of this RFP. The Village is currently seeking a contractor to provide construction and construction management services for this project. B. Scope of Work The selected contractor will be required to complete and oversee the scope of work as outlined below. Work covered by this contract includes the removal of approximately 11,000 sf of existing driveway material (at a 12" depth), disposal of all job-related materials, replacement of compact stone and reinforced concrete. See Appendix A for a site map. Proposed tasks include: o Removal and disposal of existing materials to a 12" depth; o Replacement of 4" compact stone; o Replacement of 8" reinforced concrete; and, o Finishes and joints. Village of University Park NOTICE TO BIDDERS Bid #2023-04-05 The Village of University Park has issued a Request for Proposals (RFP) for the replacement of the Village's secondary fire station driveway (995 S. Central Ave.). Bids will be received by the Village of University Park until 5:00 PM on May 12th, 2023. Bids received after that time will not be accepted or reviewed. The bid package can be accessed on the Village's website at http://bit.ly/3SUr3eW or by emailing the Village Manager, Elizabeth Scott at escott@university-park-il.com. 5/1 - 5/5 & 5/7 - 5/12/23 7426225 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.Estimate is between $180,000 - $220,000.

Final Planning

Fire / Police

$220,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
39
Bidding Soon
711
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2023

December 1, 2023

img_map_placeholder

To Be Determined, Elizabeth, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.