BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Bridgetown, Nova Scotia. Completed plans call for the renovation of a playground / park / athletic field.

The Municipality places a high value on the timely completion of this project and reserves the right to hold the contractor liable for any unreasonable or avoidable delays. The value of the liquidated damages shall be $500 per day, for the period of delay beyond the agreed upon completion date. The successful bidder may submit a final invoice to the Municipality upon completion. A 10% holdback shall be applied for 60 days following satisfactory completion. Upon award, the successful bidder and the Municipality will jointly come to an agreement on timeline for completion. The Municipality places a high value on the timely completion of this project and reserves the right to hold the contractor liable for any unreasonable or avoidable delays. The value of the liquidated damages shall be $500 per day, for the period of delay beyond the agreed upon completion date. Removal of the south west steps on the bandstand, and a 24" x 24" section of the concrete slab for construction of wheelchair lift footing Construction and installation of concrete footing with rebar for wheelchair lift at the rear of the bandstand structure, to be 24" wide x 24" long x 24" deep (see cross section of footing for wheelchair lift diagram) Raising of railing on bandstand structure to meet building code Striping of old exterior paint on all structures and painting (bandstand, bathroom building, covered roof structures with metal beams and posts) Installation of railing for rear steps of bandstand All pathways to be at minimum anywhere of 6 feet wide Gravel (crusher dust) trails, amenities and parking lot Installation of gravel and compaction Installation of geotextile fabric for pathway, amenities and rest areas Installation of rest areas, bench and picnic table crusher dust pads One picnic table pad to be constructed from crusher dust, picnic area to have a clear space all the way around table of at minimum 2000mm (see typical rest area for picnic tables diagram) One bench pad to be constructed from crusher dust, bench area to have a 850mm by 1350mm clear space at one end of bench for wheel chair access (see typical rest area for park benches diagram) Pathway cross slope to not exceed 5% Pathways and wheelchair ramp running slopes unless exception criteria apply, shall comply with the following limits on gradients: 5% or less for any distance 5.1% to 8.3% for a maximum distance of 61 m 8.34% to 10% for a maximum distance of 9 m 10% to 12% for a maximum distance of 3 m Wheelchair ramp must have rest area where any change of slope or direction occurs All work to comply with applicable building and accessibility codes All signage will be installed by Public works

Award

Playgrounds / Parks / Athletic Fields

$54,862.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
6
Bidding Soon
112
All Active Projects
41
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2023

June 23, 2023

img_map_placeholder

224 Evangeline Trail, Bridgetown, NS

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.