BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and addition to a bridge / tunnel in Hudson, New York. Design plans call for the addition of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the demolition of a bridge / tunnel.

As of May 9, 2023, Amtrak is the proposed project sponsor and would design and construct the underground concrete casing. A firm timeline for construction has not been established. The closed solicitation has been included below for reference. To protect the alignment for a future rail tunnel beneath the Hudson Yards development on the west side of Manhattan, Amtrak has constructed two sections of a concrete casing underground between 10th and 11th Avenues and 30th and 33rd Streets. Construction of the first 800-foot section (between 10th and 11th Avenues) began in August 2013 and was completed about a year later. The second section extended the project west another 105 feet under the 11th Avenue viaduct in Manhattan and was completed in 2016. The next step involves extending the casing on a diagonal alignment from 11th Avenue to 30th Street, in coordination with the Hudson Tunnel Project and private development of Hudson Yards. Early work has begun to relocate Long Island Rail Road utilities out of the path of the third section. The additional ROW would be preserved by constructing an extension to the concrete casing under the Eastern Rail Yard addressed in the March 2013 EA. The concrete casing extension (Extension) proposes extending the concrete casing under 11th Avenue to 30th Street. The Extension would be 605 feet long, between 50 and 65 feet wide and between 27 and 38 feet tall under the Western Rail Yard of the Hudson Yards. The Extension is proposed at this time because construction under the 11th Avenue bridge is dependent on the reconstruction schedule of the MOE building and its ancillary tracks; and the ROW under Western Rail Yard needs to be preserved prior to the construction of the Overbuild Project foundations. The underground concrete casing would preserve a total ROW approximately 1400 feet long for the possibility of future expansion of rail service between New Jersey and New York and supports Amtrak’s efforts to improve resiliency in response to future disasters in Amtrak’s Northeast Corridor.

Design

Bridges / Tunnels

$292,171,053.00

Public - City

Addition, Demolition, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
112
Bidding Soon
1,952
All Active Projects
851
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.