Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Site work and paving for a road / highway in Terrell, Texas. Working plans call for site work for a 204,815-square-foot road / highway; and for paving for a road / highway.

As of July 16 2025 this project is in design should be done with plans in dec 2025, but will not start until March 0f 2029. This will be a widening and reconstruct of 2 lane rural to 4 lane divided urban (Ultimate 6 lane).

Final Planning

Roads / Highways

$55,711,256.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
419
Active Projects
178
Bidding Soon
4,493
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2029

Project location map

State Hwy 205, Terrell, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed