BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Sacramento, California. Completed plans call for site work for a water / sewer project.

Bid For: Specification No. 23-10, Contract No. C51647 Salmonid Habitat Improvement, Lower Feather River Estimated Cost Range: $1,300,000 - $1,500,000 Inspection Trip: 5/24/2023 at 10AM Contractors License Classification: A LOCATION: LOWER FEATHER RIVER. . Located approximately 5 miles downstream of Oroville Dam near the Feather River Fish Hatchery, and a quarter mile downstream of the Feather River Fish Barrier Dam, the project is situated just upstream of State Route 70 and downstream of Table Mountain Boulevard, between river mile (RM) 65 and 67. Question Deadline 06/02/2023 Submit questions or requests for clarification by email to doe_specs@water.ca.gov. PROJECT DESCRIPTION: The proposed project consists of the following key elements: (1) addition or replacement of approximately 16,000 cubic yards (CY) of spawning gravel to multiple locations within the river to improvespawning conditions in these areas, including building in-river access routes to reach these areas; (2) excavation of accumulated streambed material from the entrance of Moe's Side Channel to improve hydraulic capacity and redistribute material at the head of Upper Auditorium Riffle to improve spawning conditions; (3) excavation of accumulated streambed material from the entrance and exit of the Bedrock Park side channel to increase flows and improve potential habitat accessibility; and (4) minor spoiling of excavated material in an area adjacent to the exit of the Bedrock Park Side Channel to avoid off-site haul of materials through a public park (see Figure 2). Environmental commitments incorporated into the proposed project's design include preparing a construction management plan; conducting worker environmental awareness training; implementing DWR's greenhouse gas emissions reduction plan; and preparing a stormwater pollution prevention plan, spill prevention and control plan, and a fire protection and prevention plan. 1. Importing and temporarily stockpiling gravel within designated staging areas. 2. Clearing, grading, shaping, and maintaining access routes to and between the staging areas; and clearing, grading, shaping, and maintaining access ramps from the staging areas to the river. 3. Placing stockpiled gravel in the river channel to construct riffles, berms, and in-river access routes to gravel placement locations. 4. Excavating accumulated river material at the entrances and exits of side channels to improve hydraulic capacity, increase flows, and improve potential habitat accessibility. 5. Transportation of excavated material, temporarily stockpiled at onsite staging areas, to an offsite stockpile location as shown. Completion- September 30, 2023.

Post-Bid

Water / Sewer

$1,500,000.00

Public - State/Provincial

Site Work

11

25

7

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
81
Bidding Soon
1,514
All Active Projects
627
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2023

July 1, 2023

img_map_placeholder

To Be Determined, Sacramento, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.