BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Lynnwood, Washington. Working plans call for site work for a road / highway.

As of June 21, 2023, no bids received. Project will rebid but no specific date yet. Intent to Award Notice by: Replacing May 31, 2023 with June 2, 2023. Bid Protest Deadline: Replacing June 7, 2023 with June 9, 2023. Final Questions/Clarifications Deadline May 8, 2023 at 3:00 pm A virtual Bid Opening will be conducted. The meeting link is: Join Zoom Meeting https://us02web.zoom.us/j/6692470986 Meeting ID: 669 247 0986 One tap mobile +12532050468,,6692470986# US +12532158782,,6692470986# US (Tacoma) Dial by your location +1 253 205 0468 US +1 253 215 8782 US (Tacoma) +1 669 900 9128 US (San Jose) +1 719 359 4580 US +1 346 248 7799 US (Houston) +1 669 444 9171 US +1 646 558 8656 US (New York) +1 646 931 3860 US +1 689 278 1000 US +1 301 715 8592 US (Washington DC) +1 305 224 1968 US +1 309 205 3325 US +1 312 626 6799 US (Chicago) +1 360 209 5623 US +1 386 347 5053 US +1 507 473 4847 US +1 564 217 2000 US Meeting ID: 669 247 0986 Find your local number: https://us02web.zoom.us/u/kc0rfxDesr PROJECT DESCRIPTION This Contract provides for multiple transit lane improvements to the existing Swift Bus Rapid Transit (BRT) Blue Line to improve transit speed and reliability. These spot improvements are spread along the existing Blue Line corridor starting in the City of Everett and extending south into the City of Shoreline. Improvements in the City of Everett include Transit Signal Priority upgrades between Rucker Ave./ 41st St. south along Evergreen Way corridor to Hwy 99 / Airport Rd. WSDOT jurisdiction work includes restriping of the northbound outside travel lane on Evergreen Way at SR 526 to be transit and right turn only, restriping and traffic island modifications at the intersections of Hwy 99 / 148th St. SW and Hwy 99 / Lincoln Way to allow bus through movements in the outside travel lane, and restriping of the southbound outside lane of Hwy 99 between Shelby Rd. and 148th St. SW to be a business access and transit only lane. Work in the City of Shoreline includes Meridian Ave. N re-channelization at NE 185th St. and NE 200th St., including signal system modifications at N 200th St., and Aurora Village Transit Center platform improvements to convert an existing King County Metro stop to a Community Transit stop and install an ORCA Card Reader. This Project is subject to Rule 171 as described in the Contract Documents. Final Questions/Clarifications Deadline May 8, 2023 at 3:00 pm

Final Planning

Roads / Highways

$600,000.00

Public - County

Site Work

50

5

5

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
84
Bidding Soon
2,301
All Active Projects
689
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 31, 2023

December 21, 2023

March 31, 2024

img_map_placeholder

Hwy 99 & 148th St SW, Lynnwood, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.