BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Atascadero, California. Working plans call for site work for a road / highway; and for paving for a road / highway.

Pavement rehabilitation on approximately 1.5 miles of roadway. Work includes full reconstruction, overlay, and resurfacing. Additional work includes curb ramp replacements. Est. Value Notes: $1,250,000-$1,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Pavement rehabilitation on approximately 1.5 miles of roadway. Work includes full reconstruction, overlay, and resurfacing. Additional work includes curb ramp replacement. Please note: Work on the roadways listed below shall be the first order of work on this project and shall be completed prior to the start of the Atascadero Unified School District school year on August 14th. If due to unforeseen conditions, with an approved extension of working days, or at the direction of the City Engineer, construction work on these roadways is not completed prior to August 14th, for all dates after August 14th contractor's working hours will be restricted to between 8:30 am and 2:30 pm." 1. Lewis Avenue 2. West Mall from Lewis Avenue to Capistrano Avenue 3. East Mall 4. Traffic Way from El Camino Real to Olmeda Avenue Technical questions should be directed to Ryan Hayes, Deputy Public Works Director, City of Atascadero, RHayes@atascadero.org or (805) 470-3456. All Bids has been Rejected.project will be rebid in phases.

Final Planning

Roads / Highways

$1,500,000.00

Public - City

Paving, Site Work

25

9

27

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
16
Bidding Soon
312
All Active Projects
132
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2023

August 7, 2023

img_map_placeholder

Multiple Locations, Atascadero, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.