BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Kitchener, Ontario. Completed plans call for site work for a road / highway; and for paving for a road / highway.

PART A - (RR70) Trussler Road - Shoulder widening (Intersection of Trussler Road at Knetchel Court), City of Kitchener: Removal of existing asphalt edge of pavement c/w saw-cutting and step joint, removal and disposal of a portion of existing shoulder granular A along the east side (northbound lane) of Trussler Road, placement of granular A , HL8 and HL3 to specified width and thickness for shoulder widening. Application of pavement edge line, Blvd restoration with topsoil and seed. PART B - Phillip Street MUP - Pad & Illumination (Phillip Street to ION R&T Technology Station), City of Waterloo: Illumination of existing multi-use path with independent lighting pole bases, poles, arms and fixtures, including installation of underground conduit, power supply conductors and associated appurtenances, metered pedestal service and battery powered counter. Construction of a concrete pad. Site restoration with topsoil and sod. PART C - Westchester Walkway - Illumination (Westchester Drive to Lackner Blvd), City of Kitchener: Illumination of existing asphalt walkway with independent lighting pole bases, poles, arms and fixtures, including installation of underground conduit, power supply conductors and associated appurtenances and metered pedestal service. Site restoration with topsoil and sod. PART D - Trinity Village MUP and illumination (Connaught Ave to Trinity Village Retirement Home), City of Kitchener: Removal of existing concrete sidewalk, existing lighting poles and bases, section of chain link fence and turfstone. Construction of a 3.0m wide asphalt multi-use path including entrance bollards. Replacement of concrete sidewalk and curb and gutter complete with truncated dome detectable warning plates and directional grooves. Illumination with independent lighting pole bases, poles, arms and fixtures, including installation of underground conduit, power supply conductors and associated appurtenances. Reworking connections and connecting lighting to existing City of Kitchener Meter. Trail thermoplastic markings. Site restoration with topsoil, sod and seed. PART E - (RR8) Fountain Street at King Street Crossride (Fountain Street at King Street) PART E - (RR 55) Victoria Street GRT Pad at King Street, City of Cambridge: Removal of existing concrete median and full depth asphalt removal. Relocation of 2 traffic poles including removal and replacement of pole bases. Construction of new concrete median c/w curb and guttercomplete with truncated dome detectable warning plates and directional grooves. Removal of existing pavement markings. Placement of thermoplastic pavement markings. PART F - (RR9) Caroline Street Crossride re-lining (Father David Bauer to Allen Street), City of Waterloo: Removal and replacement of concrete sidewalk and curb and gutter complete with truncated dome detectable warning plates and directional grooves. Removal of existing pavement markings, Placement of thermoplastic pavement markings. PART G - (RR8) Weber Street Crossride (Victoria Street to Wilhelm Street), City of Kitchener: Removal and replacement of concrete sidewalk and curb and gutter complete with truncated dome detectable warning plates and directional grooves. Removal of existing pavement markings, placement of thermoplastic pavement markings. Boulevard restoration with topsoil and sod. PART H - (RR9) Erb Street Interim Trail (West of Ira Needles, Westside Market Place intersection to 260m westerly), City of Waterloo: Complete construction of multi-use path, curb removal and replacement. Installation of concrete barriers and end treatments, minor ditch regrading to accommodate the installation of a multi-use path. Restoration including topsoil and seed, pavement markings, minor road reconstruction to facilitate the installation of the multi use path and various other related items. PART I - (RR54) Lackner Blvd Signalization and Pedestrian Refuge Island Removal (Lackner Boulevard at Lorraine Ave), City of Kitchener: Removal of existing pedestrian refuge island and associated concrete landing pads. Restoration of boulevard and road. Signalization, including 6 new pole bases, associated hand wells and controller pad. Placement of open cut and trenchless conduit for signals. Removal and replacement of concrete sidewalk and curb and gutter complete with truncated dome detectable warning plates and directional grooves. Removal of existing pavement markings. Placement of thermoplastic pavement markings. Boulevard restoration with topsoil and sod. PART J - (RR55) Victoria St drainage improvements (1305 Victoria St and 1572 Victoria St), City of Kitchener: At #1305 Victoria St, Installation of approx. 5m of 250mm diameter storm sewer and a catchbasin within an asphalt driveway. At #1572 Victoria St. Installation of approx., 90m of 250mm diameter storm sewer and two catchbasins within a grass boulevard. Documents can be obtained at: https://regionofwaterloo.bidsandtenders.ca Question Deadline: Wed May 17, 2023 4:00:00 PM (EDT)

Award

Roads / Highways

$2,435,157.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
84
Bidding Soon
2,141
All Active Projects
775
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2023

July 4, 2023

img_map_placeholder

Multiple Locations, Kitchener, ON


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.