BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Edinburg, Texas. Completed plans call for site work for a water / sewer project.

1.0 PROJECT: Interior lining of existing Ground Storage Tank 2.0 LOCATION: U.S. Department of Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS), Plant Protection Quarantine (PPQ), Moore Air Base, 22675 N. Moorefield Road, Edinburg Texas 78541 3.0 PROJECT BACKGROUND: Moore Air Base Galvanized Ground Storage Tank interior is corroded and is in need to install a liner to eliminate rust and protect the potable water and avoid state violations. The ground storage tank holds 43,938 gallons of water and stand at 16 ft. tall, with a 21 ft. Diameter. The Ground Storage Tank is located in an open site which provides ample space for staging of the contractor's equipment during the tank repair. 4.0 PROJECT SCOPE: Fabricate a tank liner using our NSF-61 compliant F-1 material formulation of flexible, modified polyvinyl chloride with a thickness of 0.065" on the sidewalls and on the floor. Also place a 6oz non-woven geotextile fabric between the substrate surface and the liner to level and protect the liner from being damaged by any uneven or rough areas on the tank surface. All plant-welds will be lap-weld, with a minimum 1/2" overlap. Thickness of the finished weld shall not be more than 0.010" more than the thickness of the un-welded original material. Connections (inlets, outlets, overflows, manhole) should be attached using a hot air welder. Internal penetrations should be lined with a sleeve that wraps around the pipe and sealed with a stainless-steel hose clamp. For external penetrations, the liner should go through the inside of the pipe and terminates at the flange face. Any nozzles will be field welded into the tank lining on site. The Ground Storage Tank is going to be placed out of service and drain the water. Once the Liner is in place and all field-welding is finished, the liner must be hydrostatically tested for leaks. Any problem locations must be identified and repaired by installation crew. 5.0 Materials: All tools and materials needed to perform the repair will be provided by the contractor. 6.0 Time: Job time frame is limited to five days maximum.

Post-Bid

Water / Sewer

$40,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
9
Bidding Soon
288
All Active Projects
125
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2023

June 9, 2023

img_map_placeholder

To Be Determined, Edinburg, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.