BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Rosemary, Alberta. Completed plans call for site work for a road / highway.

Work shall include road rehabilitation through shoulder pulling, road crown re-establishment (5%), compaction of the road surface and grading of the road slope. Work will take place at the above locations in the County of Newell and should be carried out in strict accordance to the following specifications: The Scope of Work includes, but is not limited to, the following: Traffic Accommodation will be the responsibility of the Contractor. Shoulders must be pulled a minimum of 2 metres from new shoulder towards toe of slope. Total uniform pulverization of vegetative product that is brought onto road surface. Product that is to be incorporated into the road surface shall be consistent in nature with no lumps, clumps or large masses. Contractor must use a Road Reclaimer to pulverise and incorporate materials. Use of discs will not be deemed acceptable, as it does not achieve the desired results. Side Slopes shall be kept at a minimum of 3:1; 4:1 side slopes are preferable in areas which allow for it. Culverts in the work area will be marked by County of Newell Staff. Should marked culverts become damaged due to the work being performed the County of Newell reserves the right to recover costs for the repair of marked culverts. Unmark culverts will be the responsibility of the County of Newell. Finished road surface widths are identified in the table above. If they cannot be accommodated they must contact the County of Newell to find a viable alternative. A minimum 98% compaction must be achieved through the use of sheep foot, smooth drum, and/or wobbly wheel packers. All ditches must be left with a smooth surface, free of lumps, clumps, large debris, or ridges. Rocks with a greater diameter than 10" must be picked and removed from the work site. The water haul route must be maintained by the contractor, keeping the route free of ruts, ridges and washboard. Sourcing and hauling of water will be the responsibility of the contractor. A minimum of 3.2 kilometres of road rehabilitation must be completed daily. It is imperative that this standard be met so that County of Newell staff can complete regravelling efficiently.

Award

Roads / Highways

$129,850.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
24
All Active Projects
8
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2023

June 19, 2023

img_map_placeholder

Multiple Locations, Rosemary, AB

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.