Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a parking garage in Hartford, Connecticut. Completed plans call for the renovation of a parking garage.
Location: 101 Lafayette Street Hartford, Ct. 1. The 525-vehicle parking garage is a single story precast concrete structure that wraps around the courthouse on the north, west and south sides. The upper level consists of a 3-inch concrete topping slab on precast double-tee beams that span between precast inverted tee girders and L-girders. The precast girders are supported by precast columns, which are supported by cast-in-place concrete spread footings. The lower level consists of a cast-in-place concrete slab on grade. Access to the upper deck is made from the Lafayette Street to the east. Access to the lower level is made from Russ Street to the north and Oak Street to the o 2. Level 2 Deck Repairs: These repairs include concrete spall repairs, buried conduit removal, sidewalk and curb repairs, deck sealant replacement, crack repairs and the placement of a new hybrid heavy duty traffic coating system over the entire upper deck that provides a 10-year warranty. The heavy-duty traffic coating system consists of an epoxy leveling course, a primer, a polyurethane base coat, two (2) epoxy wear coats and a polyurethane top coat. The upper deck repairs also include the full replacement of the deteriorated sidewalk located at the southeast entrance to the courthouse and replacement of all existing deck expansion joints. o 3. Level 1 Repairs: On the lower level, repair work includes repairs to the inverted tee girders that are showing signs of cracking, spalling and rust staining. Repairs also include removing and replacement of overhead loose concrete, crack epoxy injection, concrete cleaning, slab on grade repairs and drainage repairs and cleaning. o 4. Steel Beams: There is a mall area on the southwest side of the courthouse that includes a 6-inch concrete deck which is supported by steel beams and column that are encased in concrete. Repairs include removing rust and repainting exposed steel in this area to provide the necessary fire rating to the exposed steel o 5. Electrical Work: Garage repairs include new lighting on Level 2. The electrical work also includes new wiring to Level 2 site light poles and to existing vehicle garage access gates. Additionally a new security Guard Booth will be procured and installed. All Project Questions, Bid Questions, and Pre-Bid Equals and Substitution Requests must be submitted fourteen (14) Calendar Days prior to the Bid Due Date. Cost Estimate Range: $ 3,198,342.00 To $ 3,400,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Architect/Engineer: Macchi Engineers Email: DCamp@macchiengineers.com Construction Administrator: Urban Engineers Email: jcardinal@urbanengineers.com DAS/CS Project Manager: Steven Udeh Email: steven.udeh@ct.gov DAS/CS Paralegal Specialist: Alison Kulas Email: Alison.Kulas@ct.gov Prevailing wages are required on this project, in accordance with the schedule provided in Section 00 73 44 Prevailing Wage Rates, pursuant to Connecticut General Statutes (C.G.S.) Section 31-53 (a) through (h), as amended. Each contractor who is awarded a contract on or after October 1, 2002 shall be subject to provisions of C.G.S. 31-55a concerning annual adjustments to prevailing wages. Wage Rates will be posted each July 1st on the Department of Labor website www.ctdol.state.ct.us. Such prevailing wage adjustment shall not be considered a matter for any contract amendment. At the Pre-Bid Meeting, all prospective bidders shall sign his or her name on the official roster and list the name and address of the company he or she represents. For MANDATORY Pre-Bid Meetings, this shall be done no later than the designated start time of the Pre-Bid Meeting. No attendee will be allowed to register after the advertised start time. Bids submitted by contractors who have not properly registered and attended the MANDATORY Pre-Bid Meeting shall be rejected as non-responsive. See Section 00 25 13 Pre-Bid Meeting Agenda for details. Bid Results: Within approximately two (2) days after the Bid Opening Date, the Bid Results will be posted on CTsource Contract Time Allowed: Calendar Days: 435 calendar days Liquidated Damages: $ 1,347.00 Per Calendar Day Beyond Substantial Completion. $ 927.00 Per Calendar Day Beyond 90 days After Substantial Completion.
Bid Results
Parking Garage
$2,776,900.00
Public - City
LEED Certification, Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 14, 2023
August 14, 2023
100 Lafayette St, Hartford, CT
Related To This Project
Hartford, CT
--
Hartford, CT
Bid Date: Jun 13 2023
Hartford, CT
Bid Date: Jun 15 2023
Hartford, CT
Bid Date: Nov 10 2023
Hartford, CT
Bid Date: May 26 2023
Hartford, CT
--
Hartford, CT
--
Hartford, CT
Bid Date: May 30 2023
Hartford, CT
Bid Date: Jun 01 2023
Hartford, CT
Bid Date: May 25 2023
Hartford, CT
Bid Date: May 16 2023
Hartford, CT
Bid Date: Jun 21 2023
Hartford, CT
--
Hartford, CT
Bid Date: May 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.