BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2024 at 7:00 PM

Updated January 27, 2024

Site work and paving for a road / highway in Coldwater, Michigan. Working plans call for site work for a road / highway; and for paving for a road / highway.

This Request for Proposals provides the prospective professional service contractor (Professional) with information to enable preparation of a professional services proposal for Lakeland Correctional Facility, Paving Repairs - Replacement, Coldwater, Michigan. The service to be completed should encompass as a minimum the following phase(s) from the Department of Technology, Management and Budget's (DTMB's) Sample Standard Contract for Professional Services: Phase- 300 Schematic Design 400 Preliminary Design 500 Final Design 600 Construction Administration - Office Services 700 Construction Administration - Field Inspection Services The Project includes, but is not necessarily limited to, soil erosion and sedimentation controls, removal of concrete and asphalt pavements, removal of abandoned roads and parking lots, minor grading improvements, installation of aggregate base, hot mix asphalt paving, concrete paving, concrete curb and gutter, concrete sidewalks, furnishing and spreading topsoil, hydroseeding and site restoration.

Final Planning

Roads / Highways

$2,873,800.00

Public - State/Provincial

Paving, Site Work

15

10

2

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
185
Bidding Soon
1,992
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2023

September 5, 2024

Project location map

141 1st St, Coldwater, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.