BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 19, 2025

Site work and paving for a mixed-use development in Santa Ana, California. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and road / highway.

Project has been Cancelled Question Deadline 08/13/2025 at 2:00 PM PT Online Q&A Yes Bid protests must be submitted in writing to the Executive Director of the Public Works Agency, City of Santa Ana, 20 Civic Center Plaza M-21, Santa Ana, CA 92701 before 4:00 p.m. of the 5th business day following bid opening Reconstruction/resurfacing of asphalt concrete pavement. Portland cement concrete pavement, sidewalk, curb & gutter, cross gutter, and curb ramp repairs. Traffic improvements include traffic loops and striping. In accordance with the California State Labor Code, prevailing wage rates apply. Copies of the prevailing rate of per diem wages are on file with the Public Works Agency and shall be made available to any interested party on request.Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Since the services are being performed as part of an applicable "public works" or "maintenance" Bid Proposal Guaranty shall be uploaded to PlanetBids along with project bid. Bid Proposal Guaranty shall be in the form of a cashier's or certified check payable to the City of Santa Ana, or Bid Bond issued by a corporate surety, in an amount not less than ten percent (10%) of the bid aggregate, as a guarantee that the Bidder will enter into the proposed contract if the same is awarded. The signature of the bidder on the bid bond must be notarized. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY, one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%) of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment Bond). This Contract shall not become effective until such bonds are supplied to and approved by the CITY. The City Council reserves the right to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a notice to proceed with the project notwithstanding any pending or continuing challenge to its determination.

Final Planning

Roads / Highways

$1,281,000.00

Public - City

Paving, Site Work

7

9

4

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
660
Active Projects
289
Bidding Soon
3,625
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

February 18, 2026

Project location map

Grand Ave, Santa Ana, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.