BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Moreno Valley, California. Completed plans call for site work for a water / sewer project.

The Contractor shall perform all work necessary to complete the Contract in accordance with the Contract Documents. Unless otherwise specified, the Contractor shall furnish all materials, equipment, tools, labor, and incidentals necessary to complete the Work. The Contractorshall provide all labor, power, light, water, materials, equipment, tools,scaffolding, machinery, transportation, insurance, permits, bonds, temporary protection, watchmen, and Superintendents necessary to construct and complete all Work, and to furnish all materials included in the Contract, except those furnished by the County asspecifically stated in the Contract Documents. PROJECT DESCRIPTION A. General: 1. The descriptions in this Section are not intended to provide or be construed as a complete summary of the Contract Documents. The following only identifies in broad terms the general nature of the Work to be performed by the Contractor and its Subcontractors. 2. Contractor shall perform and complete all Work in accordance with the requirements set forth in the Contract Documents. 3. This Section should read as if "Provide and Install" were included at the front of sentences, as applicable. a. Responsibility forthe providingand the installingof every elementof theWork is borne by the Contractor, unless otherwise noted. Question Deadline 05/19/2023 at 5:00 PM PT All questions must be submitted in writing to Manuel Ruiz via email at manuelruiz@rivco.org Each bid proposal must be accompanied by a bid security in the form of either cash a certified check a cashier check or a bidder bond executed by an admitted surety insurer equal to ten percent (10%) of the total aggregate amount of the bid. The successful bidder must furnish county with payment and performance bonds with each issued by a california admitted surety insurer and each in an amount equal to 100% of the contract price. Badlands Phase 2, Stage 1 (P2S1) Liner Expansion Project The work must be completed within 414 working days from the date the county issues the notice to proceed with the work.

Award

Water / Sewer

$27,726,310.00

Public - County

Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
96
Bidding Soon
2,142
All Active Projects
965
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2023

July 17, 2023

img_map_placeholder

31125 Ironwood Ave, Moreno Valley, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.