BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a medical facility in Fort Worth, Texas. Completed plans call for site work for a 245,000-square-foot medical facility.

The selected Respondent must collaborate with the District, and its Project Manager, Architect and engineers during the completion of the Construction Documents in order to provide preconstruction services including, but not limited to advising the District on proposed site use and improvements; selection and availability of materials and labor; constructability guidance; cost estimation; time requirements for procurement, installation and construction; use of temporary facilities; factors related to the cost of the Work including cost of alternative designs or materials, preliminary budgets and life-cycle data, resolution of conflicts in the proposed drawings and specifications as they evolve; methods of delivery and handling of materials, systems, and equipment; traffic, parking and materials and equipment storage in and around the site; safety issues and available precautions related to the Work; scheduling issues including phased construction and potential fast track scheduling; attendance at public meetings concerning the design, development, scheduling and Work of the Project; and any other matters necessary to accomplish the Project in accordance with the District's schedule. Following the District's acceptance of the Final GMP Proposal and execution of the Final GMPAmendment (or earlier in accordance with a Work package authorization), the selected Respondent shall provide all labor, materials, and equipment, coordination management, and supervision necessary for the construction of the following improvements: CM at Risk for a new Medical Office Building according to Exhibit C. The selected Respondent will have overall responsibility for and shall provide complete Preconstruction Phase Services and Construction Services for the Project as set forth in the Contract Form (as defined below in Section 1.3). The estimated Construction Budget is: $100,659,496. The District requires the improvements to reach substantial completion by: December 31, 2026. The District requires the improvements to reach final completion by: January 27, 2027. Minority, Woman, and Veteran Owned Business Enterprises ("MWVBEs"). The District establishes a 25% good faith target goal. The construction budget is approximately $120,000,000

Post-Bid

Medical

$120,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
346
Active Projects
195
Bidding Soon
4,870
All Active Projects
1,970
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 7, 2023

November 1, 2024

January 27, 2027

img_map_placeholder

1500 S Main St, Fort Worth, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.