BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a mixed-use development in Wolfeboro, New Hampshire. Completed plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

The following contractor requirements and information are to include but not limited to the following services and specifications required to provide a fully functioning turnkey lighting system. Lighting Conduit (Designated in Red on the Attachment A. Project Overview Map) The total lateral length of the electrical lighting circuit is 2,440ft. Excavation and installation of 1 Schedule 40, Electrical grade PVC conduit system along a 2,255ft. section of the total circuit length (per Attachment B. UR-LT, Ditch Specification). Electrical conduit shall be connected to the precast conduits of the light post foundations to form a continuous run from electrical service to light and from light to light. Questions regarding this bid or to schedule a site visit will be addressed by contacting Barry Muccio ofthe Wolfeboro Municipal Electric Department at (603)569-6975 or via e-mail: meddirector@wolfeboronh.us Note that a 50ft section of the above 2,255ft, will require a 36 depth and schedule 80 conduit under the proposed private driveway extension of Willow Street. Excavation and conduit installation along a 55ft. section has already been completed during a 2022 parking lot project. The remaining 130ft. will need to be affixed to the walking bridge structure within a galvanized steel EMT (Electrical Metal Tubing) with weatherproof fittings and boxes. Longitudinal runs of conduit will be installed in as straight and direct a line as possible. All conduit end joints, and internal finish shall be free of sharp edges and burrs which could damage the cable while pulling. Provide and Install sand backfill material as a bedding and direct cover material for conduit system as per provided specifications. Backfill and compact the existing excavated material above the sand bedding in 12-inch interval lifts to ensure settling is minimized. Install a continuous caution/warning tape approximately 10 above the conduit and 8 below the finished grade of the ditch line. All buried conduit joints shall be cleaned and glued per manufacturer recoendations. All above grade PVC riser' conduits shall be provided for in Schedule 80 as required.

Award

Sidewalks / Parking Lot

$84,495.00

Public - City

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
45
Bidding Soon
906
All Active Projects
330
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2023

June 26, 2023

img_map_placeholder

Multiple Locations, Wolfeboro, NH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.