Site work and paving for a mixed-use development in Port Washington, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

History of watermain breaks - 6 recorded watermain breaks (1 per 166') Pavement condition/rating - 3 (Poor) Average daily traffic - Estimated less than 150 vehicles per day (vpd) In close proximity to other streets in need of improvement for 2025 Surface Drainage problems Requires a high level of maintenance (patching) Based on approximately 58 miles of City streets and highways for which the City is responsible to maintain, an average of approximately 1.4 miles of streets must be improved to attain a goal of improving streets on a minimum 40 year cycle. Health Impact - By eliminating watermain breaks and service interruptions, we improve the well being of the community. Properly draining streets eliminates icing problems or mosquito producing puddles. New pavement and storm inlet grates protects the public from walking and biking hazards. Environmental Impact - Improved streets create a clean and attractive community, and increased property values. Operational Impact - Improved streets eliminates time spent on patching and pothole filling. Legal Impact - Improved streets meet ADA ramp and sidewalk requirements, and replace hazardous storm grates with bike safe grates. Alignment with City's Plans - Conforms with the practical vision to Create Engaging Public Spaces and Invest in Critical Infrastructure. Funding - Grants are sought through the Local Road Improvement Program and the State Surface Transportation Program - Urban through the Bipartisan Infrastructure Law. Estimated Costs include engineering, design, staking, construction, and inspection. Necessity of Project - Essential As of May 10, 2023, this project is included in the City of Port Washington's Fiscal Year 2023-2027 CIP and funding is allotted for FY 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$478,400.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
38
Bidding Soon
696
All Active Projects
281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2025

img_map_placeholder

N Crocker Ave, Port Washington, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.