BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a fitness / recreation center in Snow Hill, Maryland. Completed plans call for the addition of a fitness / recreation center; for the demolition of a fitness / recreation center; and for site work for a fitness / recreation center.

Recreation Center Storage Addition - Provide labor, materials and equipment for the construction of an addition to the existing Worcester County Recreation Center Question Deadline Friday, June 2, 2023 at 12:00 PM ET Questions must be addressed in writing to the Worcester County Procurement Officer at nrice@co.worcester.md.us. 1. The existing building currently contains offices and recreation facilities. Water and sewer service are supplied by Town of Snow Hill, Maryland. Electric service is provided by Delmarva Power. 2. Additions include approximately 1500 square feet for equipment storage. The Successful Vendor will be required to coordinate with Worcester County Personnel, Architect/Engineers, Building Director, and County designees as appropriate to complete the project. This project will require relocation of existing gas piping underground to the existing building prior to construction of the new addition to allow continued service of the existing facility. Any utility outage must be approved by the facility manager. 3. Time for Performance: Construction for the building shall be substantially complete in 12 Months beyond "Notice to Proceed" by Worcester County. The contractor shall provide a timeline schedule of all major work and provide to the owner. Schedules must be updated monthly. Project progress meetings will be held bi-monthly. The contractor will be responsible to meet with and coordinate sub-contractors on-site. 4. Equipment and Material Supply and Installation - per Architect's Drawings and Specifications "Worcester County Recreation Storage Addition". 5. Construction Services - Supply all labor and supervision, tools and equipment necessary to complete the project in accordance with the plans and specifications. 6. The contractor shall submit within 10 days after contract award a schedule of values and timeline schedule for review and approval by the owner and architect. 7. The Local Jurisdiction for the project is Worcester County Maryland. 8. Material supply shop drawings are required for owner approval. Submittals shall include equipment drawings, specifications, brochures, and literature that describes the equipment proposed. Submittals mechanical, electrical, and those designated on the architectural drawings are required. A minimum of four (3) copies of submittals are required and one copy will be returned to the general contractor. Structural shop drawings for the steel building require design and certification by a Maryland Engineer. Designs must include COMcheck reports showing energy code compliance. 9. Material color selections shall match the existing building and shall be approved by the Owner and Architect. Submittals are required. 10. Upon completion, the contractor shall provide a set of "As-built drawings" showing all deviations from the contract drawings and actual installation details affecting architectural, electrical, mechanical, civil, structural, plumbing and HVAC systems.

Award

Fitness / Rec Centers

$355,500.00

Public - County

Addition, Demolition, Site Work

15

6

20

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
62
Bidding Soon
945
All Active Projects
357
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 12, 2023

July 13, 2023

July 10, 2024

img_map_placeholder

6030 Public Landing Rd, Snow Hill, MD


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.