BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, new construction and renovation of a mixed-use development in Auburn, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; and for the renovation of a educational facility.

Swanson Road Intermediate School Boiler Conversion.- Sub Estimated Cost $325,000 Download free electronic set or order hard copy set for $35 plus $50 deposit. The job site and/or existing building will be available for inspection on 5/19/23 @ 9:00 A.M. Bidders should meet outside the main entrance to the building (do not enter the school). Question Deadline 05/21/2023 Any and all questions regarding the Drawings, Specifications or Bid shall be directed, in writing by email, to the Project Architect, Steve VanDyke, Nault Architects, Inc. admin@naultarchitects.com. No exceptions. A. The work to be done under this contract consists of executing and completing all work required for the Swanson Road Intermediate School Boiler Conversion in Auburn Massachusetts. For this contract, the HVAC Contractor will be the Prime Contractor, responsible for management and sub-contracting of the complete project. B. The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: 1. Replacement of existing oil-fired burners with new gas-fired burners. 2. Provide new gas-fired boiler and associated pumps. 3. Provide new indirect domestic hot water tank and associated pump and controls. 4. Furnish and Install temporary domestic hot water heater until the permanent system operates then remove. 5. New venting of existing and new boilers. 6. Update Owner's control system to integrate the new boiler, water heater and pumps. 7. Related electrical and plumbing work. C. The following major elements will be performed by the Owner, under separate contracts, for which the Prime Contractor has a coordinating responsibility: 1. The School District will remove the existing underground heating oil tanks, install the new underground propane tanks, extend gas piping up to the exterior of the building terminating with a valve, backfill the excavation and repave the disturbed area. Bid Result PLUMBING Performance Plumbing & Heating Inc-$78,824 ELECTRICAL Laracy Electrical Contractors Inc-$31,300

Bid Results

Educational

$110,124.00

Public - City

Demolition, New Construction, Renovation

8

13

6

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
180
Bidding Soon
3,277
All Active Projects
1,356
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.