BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Asbestos abatement and renovation of a residential development in Lynn, Massachusetts. Completed plans call for the renovation of a residential development; and for asbestos abatement for a residential development.

Buildings A and C replace existing Asphalt Shingles, Metal Flashing and underlayment. At Buildings A, B and C Front and Rear Entry Awnings replace existing Asphalt Shingles, Metal Flashing, underlayment and select awning wood trim as noted. At Building C Rear Entry replace one existing Awning framing and trim. Asbestos abatement at existing metal step flashing to be removed is required. complete within 45 consecutive calendar days. The work is estimated to cost $ 129,000.00 The participation goals for this project shall be 15.3% for minorities and 6.9% for women. he work under the Contract consists of: Replace existing asphalt shingles and underlayment's at; building A and C including front and rear building entry awnings; building B front and rear building entry awnings; all attached mechanical, electrical and laundry room roof areas. The roofing scope of work excludes the building B main roof areas which are existing to remain (see 2 below.) At all building entry awnings replace trim pieces as noted in elevations (see 3 below.) At Building C Unit 330 rear entry replace the existing cantilevered wood entry awning including all new wood framing and associated interior and exterior finishes. At Buildings A, B and C building entry awnings The General Contractor shall: (i) Remove and legally dispose of existing wood cove moulding as indicated on the elevations. Furnish and install new pvc cove moulding (ii) Remove and legally dispose of existing wood trim as indicated on the elevations. Furnish and install new pvc trim (iii) Remove and legally dispose of existing painted plywood sheathing as indicated on the elevations. Furnish and install new painted plywood sheathing. (iv) Furnish and install new soffit vents as indicated (v) Patching and Repairs- Perform all necessary patching and repairs to the items scheduled to remain. At Building C unit 330 Rear Entry only the General Contractor shall: (i) Remove and legally dispose of existing and furnish and install new; cantilevered wood awning framing, trim and associated interior floor and ceiling finishes. Location- Essex St & Tilton PlLynn, MA 01902, USA

Bid Results

Residential Subdivision

$160,000.00

Public - City

Asbestos Abatement, Renovation

13

15

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
267
Active Projects
143
Bidding Soon
2,517
All Active Projects
1,059
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2023

June 26, 2023

img_map_placeholder

Multiple Locations, Lynn, MA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.