BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 10, 2024 at 8:00 PM

Updated June 5, 2025

Site work for a water / sewer project in Corpus Christi, Texas. Completed plans call for site work for a water / sewer project.

The Work to be performed under these Drawings and Specifications consists of furnishing all labor, materials, and equipment for performing all Work required for mobilizing; demobilizing; conducting surveys; protection of the environment; protection of the environment, excavation, construction of approximately 460 linear feet of breakwater, dredging two nearshore borrow sources or obtaining sand from an approved upland source, and installing approximately 2,200 cubic yards of fill material along a breached portion of the islands northwest shoreline and up to approximately 15,000 cubic yards of dredged material within a nearshore feeder berm template near the southwestern shoreline. The anticipated completion deadline for all Work is February 13th, 2025, in compliance with conditions of the U.S. Army Corps of Engineers individual permit. Question Deadline 06/10/2024 at 5:00 PM CT The deadline for questions and clarifications All questions or clarifications should be submitted on the Civcast USA Website. Three main project components: North Breach Fill Work includes dredging of material from the designated borrow areas (Base Bid) or importing material from an upland source (Alternate Bid) and mechanical placement within the North Breach Fill template. North Breach Fill Breakwater Work includes minor earthwork as required to meet foundation elevations and construction of approximately 462 linear feet of Gabion Basket or Artificial Reef breakwater. Feeder Mound (Additive Bid 1) Work includes dredging of material from the designated borrow areas and hydraulic or mechanical placement within the Feeder Mound template. Miscellaneous items include environmental protection, construction surveying, and site cleanup/restoration.

Bid Results

Water / Sewer

$1,897,650.00

Public - City

Site Work

18

18

16

7

Subscribe For Documents

97 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
22
Bidding Soon
393
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2024

August 19, 2024

Project location map

To Be Determined, Corpus Christi, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.