BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in North Little Rock, Arkansas. Completed plans call for site work for a water / sewer project.

The Supplier’s responsibilities consist of furnishing equipment and services for a complete MBR wastewater treatment system as identified in this section. The Santa Clara Creek WRRF will be built in multiple phases. This RFP is for the supply of MBR equipment and services for Phase 1 only. The Phase 1 design of the MBR system shall include provisions to facilitate the expansion to Phase. The Phase 1 project will include the construction of concrete basins for three bioreactor treatment trains (herein referred to as reactors), using common wall construction. At the end of the three reactors, a minimum of four MBR basins shall be constructed. In Phase 1, two reactors shall be outfitted for MBR operations while the third reactor remains empty to act as an equalization basin. Additionally, three MBR basins shall be outfitted with MBR units (membranes), with some spare space in each MBR basin for future MBR units’ installation. The fourth MBR basin will remain empty.The selected Supplier will be responsible for furnishing all equipment and services required for the Phase 1 MBR treatment system. This does not include installation, concrete, electrical wiring and conduits, liquid piping, air piping, or basic manual gates. The Supplier is responsible to provide instrumentation, specialty valves and motorized actuators, control panels, and programming with their system. Additionally, the Supplier is responsible to provide in-basin permeate piping, air piping, and related equipment, hardware, and supports. The Supplier is also responsible for assisting the General Contractor with any questions and incompatibilities that arise during installation of supplied equipment. The Supplier is responsible for overseeing the initial installation of equipment and all testing and start-up procedures, including but not limited to training Owner’s operations staff on the proper operation and maintenance of the equipment and providing O&M manuals for all equipment supplied.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

5

18

4

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
15
Bidding Soon
240
All Active Projects
100
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2023

July 7, 2023

img_map_placeholder

Multiple Locations, North Little Rock, AR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.