BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Oklahoma City, Oklahoma. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Work consists of construction of Filter No. 11 Rehabilitation, including the described work, and incidentals for complete and usable facility: 1. Filter No. 11: a. Demolition/ Removal and off-site disposal of existing filter media, and underdrain system. b. Installation, testing, disinfection and commissioning of new underdrain system, filter media and media retention caps: 1) Materials for new underdrains, filter media and media retention caps are provided by Owner. Installation of new media retention caps shall follow manufacturer's instructions. The bill of materials for all Owner provided equipment and materials is included in the attachments to this section. 2) Following demolition, Owner, Engineer, and Contractor shall provide two (2) weeks' notice prior to inspection of filter bays and determine type of and quantity of concrete repairs (if any) as indicated on the unit price portion of the bid form and specified herein. 3) Contractor shall be responsible to provide any and all materials (i.e. grout, epoxy system for anchors, etc.), equipment, and labor as required to integrate the Owner provided materials to provide a complete and working underdrain system as specified herein. (i.e. grout, epoxy system for anchors, etc.). 4) Contractor shall be responsible to provide manufacturers field services during installation, testing, and commissioning of the filter No. 11 underdrain system and media retention cap Assignment of procurement contract provided in Amendment No. 1 to the Contract. c. Installation, testing, disinfection, and commissioning of filter media: 1) Filter media for Filter 11 to be provided by Owner and are currently on-site in storage supersacs. 2) Contractor shall be responsible to install, test, disinfect and commission media as specified herein. 2. Concrete Repairs: a. As identified during demolition operations, Owner, Contractor, and Engineer will agree on any existing conditions which require repair. All concrete repairs will be performed by the contractor in accordance with the specifications, however, concrete repairs made necessary by action of the Contractor shall be considered outside the scope of work will not receive payment. Question Deadline 05/26/2023 at 10:00 AM CT

Award

Water / Sewer

$688,788.00

Public - City

Renovation, Site Work

14

27

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
49
Bidding Soon
522
All Active Projects
237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2023

July 7, 2023

img_map_placeholder

13700 S Douglas Blvd, Oklahoma City, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.